If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24421 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.6976451648,"lon":-80.8988652281,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-11-27 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 39.6976451648 | |
Longitude: -80.8988652281 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-121786096 | 2013-11-18 | The said well was spudded by on 11/12/2013 by Butche's Rat Hole with 100' of 20 conductor being set and cemented to surface, A 20 diameter mouse hole is being drilled with a 16 pipe to be set and cemented by grouting to surface with a .500 thick steel plate on bottom. | ||||
1387721344 | 2013-12-22 | On 12/20/13 Orion Drilling is now on the hole and 515' of 13.375 surface casing was set and cemented to surface by Halliburton cement services, a sting in cement shoe was used with 19 barrels of cement returns to surface. | ||||
1394047895 | 2014-03-05 | Status check inspection found Orion Drilling has moved back on to the well and is testing the blow out preventer with anticipation of drilling out from under the surface pipe within the next 6 hours. | ||||
1394723460 | 2014-03-13 | Status check inspection on the drilling process found the company drilling the production borehole at 10,473' using a 8.5 drill bit with a true vertical depth of 6,339.91' and inclination of 89.35 degrees and mud weight of 11.7# and viscosity of 68. |