Well Details

Well ID: 34-163-20911
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1994-12-07
Unconventional:
Horizontal:
Producing: No
Violations: 3
Latitude: 39.3545493329
Longitude: -82.4324200408

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1516842379 2009-10-20 At 8:51 am, I called Mr. Bob Wray at his house and left message regarding the final restoration and plugging report for this well. Furthermore, I asked for a return call to discuss violations.
-1566990953 2009-08-31 Called Mr. Bob Ray at 9:34am. No answer and unable to leave message.
-1771110130 2008-11-03 Contacted Mr. Bob Ray, Circleville Gas Co., by telephone. He states that he can not meet today, but would call later in the week to set up a meeting at the site.
-1843524010 2008-11-13 FOLLOW UP TO NOV # 1227285874 An inspection revealed that the final restoration does not meet requirements. The lease road will need to be restored. A 200 feet section of the lease road contained ruts 1ft to 3ft deep and will need to be graded. Steel and plastic flowline remains along the lease road and well site. Electric line and pole(s) were also observed along the lease road and well site. A fiberglass tank, casing, rack, and debris will need to be removed.
-1924645263 2010-07-20 Called Mr. Bob Wray today, on his cell phone, at 9:35 a.m. and provided him with the contact information for the landowner of property containing delinquent final restoration. He was informed of two requirements: remove pipe racks and restore/or provide waiver for gravel lease road (from entrance to a "Y" location.) Emphasized to Mr. Wray the importance of completing this restoration to avoid further enforcement action being taken by the Division. Mr. Wray stated that he would get this taken care of for me. A courtesy notice for a non-related well in Morgan Co. requiring the casing to be cut and ID plate installed was also brought to Mr. Wray's attention. Mr. Wray acknowledged the well site and stated money had been paid to individual to perform the work. Note: During our conversation, Mr. Wray states that he no longer owns Circleville Oil & Gas; And company is in bad financial trouble and "will never shine."
-2003894823 2009-09-21 A follow-up inspection revealed non-compliance. Oilfield debris to include pipe rack and production and electric line need to be removed. Landowner waiver needed for lease road.
-336350635 2009-06-29 A follow-up inspection revealed that flowline and electric line have been removed, and well site graded. Hay has been applied to the entire location. The Notice of Violation has been resolved. The Final Restoration will not be approved until vegetative growth has been observed. A Final Restoration inspection will be conducted later this summer to check status of vegetative growth.
-344235880 2008-11-13 FOLLOW UP TO NOV # 1227285874 An inspection revealed that the final restoration does not meet requirements. The lease road will need to be restored. A 200 feet section of the lease road contained ruts 1ft to 3ft deep and will need to be graded. Steel and plastic flowline remains a
-395343532 2009-07-28 A follow-up inspection conducted with Mr. Robert Stonerock, Oil & Gas South Region Supervisor revealed non-compliance. During the inspection, it was noted that a landowner waiver would be neeeded for the lease road. Oilfield debris, plastic and electric line will need to be removed.
-707083928 2011-10-24 An inspection revealed pipe racks, and 6 foot section of plumbing, with plastic line and steel fittings are present on the site. Vegetation has been established. Mr. Bob Wray was contacted and notified of the violation on 10/24/11 at 12:51 pm. NONE3
-901059034 2008-11-13 FOLLOW UP TO NOV # -1843524010 FOLLOW UP TO NOV # 1227285874 An inspection revealed that the final restoration does not meet requirements. The lease road will need to be restored. A 200 feet section of the lease road contained ruts 1ft to 3ft deep and will need to be graded. Steel and plastic flowline remains along the lease road and well site. Electric line and pole(s) were also observed along the lease road and well site. A fiberglass tank, casing, rack, and debris will need to be removed.
1021291974 2008-11-13 FOLLOW UP TO NOV # 1227285874 An inspection revealed that the final restoration does not meet requirements. The lease road will need to be restored. A 200 feet section of the lease road contained ruts 1ft to 3ft deep and will need to be graded. Steel and plastic flowline remains along the lease road and well site. Electric line and pole(s) were also observed along the lease road and well site. A fiberglass tank, casing, rack, and debris will need to be removed.
1087628029 2009-10-07 Called Mr. Bob Ray on his cell phone at 1:49 PM regarding Final Restoration. No answer or voice mail.
1135000608 2005-11-17 Attempted to pump bottom cement plug through tubing. However, the tubing was blocked with paraffin.
1227285874 2008-11-13 An inspection revealed that the final restoration does not meet requirements. The lease road will need to be restored. A 200 feet section of the lease road contained ruts 1ft to 3ft deep and will need to be graded. Steel and plastic flowline remains along the lease road and well site. Electric line and pole(s) were also observed along the lease road and well site. A fiberglass tank, casing, rack, and debris will need to be removed. NONEA
1227285874 2008-11-13 An inspection revealed that the final restoration does not meet requirements. The lease road will need to be restored. A 200 feet section of the lease road contained ruts 1ft to 3ft deep and will need to be graded. Steel and plastic flowline remains along the lease road and well site. Electric line and pole(s) were also observed along the lease road and well site. A fiberglass tank, casing, rack, and debris will need to be removed. NONEB
1280758035 2010-07-15 Contacted Mr. Bob Wray on his cell phone today at 10:55 a.m. regarding the delinquent final restoration. He was informed that pipe racks remain on location and will need to be removed. Mr. Wray states that he is currently in Pennsylvania and will call me on Monday. Further stating that he will try to find out landowner name.
1289031501 2009-11-23 A follow-up inspection revealed non-compliance. Two steel pipe racks, plastic line and drip equipment remain near well location. The lease from entrance into property contains gravel to a location where the road splits. From the split to the well location the road has been reclaimed and vegetative growth is acceptable. A landowner waiver will be required for gravel portion of road.
1384786801 2013-11-18 Compliance notice follow up. There is a set of pipe racks and production line still on site. The Final restoration is not finished.
1589483805 2008-11-13 FOLLOW UP TO NOV # -344235880 FOLLOW UP TO NOV # 1227285874 An inspection revealed that the final restoration does not meet requirements. The lease road will need to be restored. A 200 feet section of the lease road contained ruts 1ft to 3ft deep and will need to be graded. Steel and plastic flowline remains a
1663631713 2009-05-05 A follow-up inspection revealed non-compliance. The status of the final restoration remains the same, as no work has been performed on the property. Photographs were obtained from this inspection. Mr. Bob Ray had been given until 5/1/2009 to complete final restoration. Mr. Ray will be contacted by telephone regarding the plug report and final restoration.
1716466273 2008-10-28 Contacted Mr. Bob Ray, Circleville Gas Co., by telephone regarding the status of this well. He states that the well had been plugged a few years ago. Mr. Ray was informed that the final restoration would need to be performed. Mr. Ray states that he would be in the area next week and to call and set up a time to meet.
1887093003 2008-10-17 The well was not located during the inspection. This well may have been plugged. Equipment such as, flowline, electric line and pole(s), casing, rack, and fiberglass tank were observed. The lease road has not been restored. At the time of the inspection, RBDMS showed the well status as PR. Mr. Bob Ray, the well owner, will be contacted by telephone regarding this inspection.
2086013866 2009-05-05 Called Mr. Bob Ray on his cell phone, 614-208-3400, at 9:55 AM regardin, the delinquent Final Restoration. Mr. Ray states that he completely forgot about the restoration deadline. Also reminded Mr. Ray that I have not received the plugging report for this well.
544048164 2003-11-19 Restoration meets 1509.072(A) requirements.