If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-22668 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.300155364,"lon":-80.5305301827,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 1985-01-04 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 1 | |
Latitude: 41.300155364 | |
Longitude: -80.5305301827 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1308905543 | 2013-03-20 | My inspection found the no dike built around the tank battery per my request on 10/18/2012. I spoke with Mr. Dixon and he showed me a 5' to 6' section of poly sales line that was sticking up out of the ground approximately 2'. It was located approximately 460' southwest of the tank battery on the adjacent field. I called Jamie Campbell, field supervisor, at 440-858-7252. I reminded him that I requested a dike be built around the tank battery back on 10/18/2013. Also, I told him bury the sale line. Mr. Dixon informed me that he has been taking care of the up keep on the lease road. I took photos to document the condition of the tank battery and separator, the poly sales line, and a pile of asphalt used for the lease road. | 9-9-05(A)9 | |||
19141406 | 2012-10-18 | My inspection found this well in production. The well was equipped with a plunger lift unit. The tank battery contained one, partially rusted, 100 barrel production tank and one, rusty, 50 barrel brine tank. There was no dike surrounding the tank battery. There was a plug in the load line. The heat treated separator had the correct spacing from the tank battery. A stenciled identification sign was posted on the production tank with half of the required information. The lease road was in good, stable condition and shared with permit number 2-2669. According to our database, the last reported production was in 2010. I called Big Sky at 740-624-0434. I instructed Big Sky to build the proper dike around the tank battery. | ||||
PL3657 | Preliminary Restoration done information from Data Point |