If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23085 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.1054473362,"lon":-81.5883439029,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2009-07-21 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 41.1054473362 | |
Longitude: -81.5883439029 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1177193682 | 2009-07-30 | Dailey Exavating and ChemTech were on site to solidify the drilling pits. | ||||
-723516391 | 2009-07-22 | Wildcat is drilling ahead. The drilling pits are fenced, lined and in good condition. No violations at this time. | ||||
-801815174 | 2010-04-20 | Preliminary restoration is approved. | ||||
1248890429 | 2009-07-21 | Wildcat will be drilling later this morning and should be ready to set surface casing later tonight. The shale pit liner has been cut by demolition debris in the pit and will be replaced before drilling begins. | ||||
1249394434 | 2009-07-28 | The drilling pits are fenced, lined and in good condition. They are also being pumped down prior to solidification which is scheduled for 7/30. | ||||
1259080617 | 2009-11-17 | The well is in production and the affected areas have been seeded andmulched and are growing. Preliminary restoration should be approved by early spring at the latest. | ||||
142856789 | 2009-07-15 | The location is built and waiting for Wildcat Drilling. The rig is scheduled to move on 7/20. | ||||
908930517 | 2009-08-13 | The well has been fraced and the site has been rough graded. Tank battery equipment is being delivered. |