34-155-22606

Well Details

Well ID: 34-155-22606
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1984-08-18
Unconventional:
Horizontal:
Producing: No
Violations: 2
Latitude: 41.4044659971
Longitude: -80.9967427524

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1442263480 2009-10-23 Company still removing oil rising from spill area over lease road being caught behind syphon dams .
-1830508867 2009-11-19 Inspection showed remedial work inside dike has been completed , also earthen dike has been established . Syphon dam at furthest end of spill area will remain until spring . Company is in process in getting approval from landfill to hall oil stained material to landfill . VIOLATION IS RESOLVED PENDING INSPECTION IN SPRING OF 2010 .
-1931919143 2009-10-14 Inspection showed clean-up is still ongoing .
-353797902 2009-11-12 Inspection showed there is oil soaked absorbent material inside dike that needs removed . Syphon dams are still in tact .
-886683092 2009-10-27 Inspection showed syphon dams are still in place and working sufficiently , dike area still have absorbent pads to be removed .
-994080476 2009-10-13 FOLLOW UP TO NOV # 1256733402 Arrived on site to find company in process of cleaning up oil stained material from inside dike area . After conf. With company and inspection of dike and spill area , there was approx. 50 bbl. Of oil overflowed inside dike area , approx. 3-5 bbl had flowed over n-w corner of dike wall . Oil flowed north down access road approx. 100' then flowed west into road ditch and traveled north 100' to culvert under driveway into wet area approx.50'X75' where oil had been contained . Oil stained material in wet area had already been removed and stockpiled on liner west of tank battery area . While on site company established siphon dams on west side of access road where oil had flowed into road ditch and north of driveway just before wet area . When I left site spill area had been secured from any further oil contamination .
1099930726 2004-11-08 Inspection per request from Gene Mueler w/ company and Marcia Mikolaj[landowner] . Inspection showed oil on surface approx. 5' x 20' from flowline leak . I advised Gene all oil and oil stained material had to be removed and soil needed replaced .
1256733402 2009-10-13 Arrived on site to find company in process of cleaning up oil stained material from inside dike area . After conf. With company and inspection of dike and spill area , there was approx. 50 bbl. Of oil overfiowed inside dike area , approx. 3-5 bbl had flowed over n-w corner of dike wall . Oil flowed north down access road approx. 100' then flowed west into road ditch and traveled north 100' to culvert under driveway into wet area approx.50'X75' where oil had been contained . Oil stained material in wet area had already been removed and stockpiled on liner west of tank battery area . While on site company established syphon dams on west side of access road where oil had flowed into road ditch and north of driveway just before wet area . When I left site spill area had been secured from any further oil contamination . 9-1-07
1256733402 2009-10-13 Arrived on site to find company in process of cleaning up oil stained material from inside dike area . After conf. With company and inspection of dike and spill area , there was approx. 50 bbl. Of oil overfiowed inside dike area , approx. 3-5 bbl had flowed over n-w corner of dike wall . Oil flowed north down access road approx. 100' then flowed west into road ditch and traveled north 100' to culvert under driveway into wet area approx.50'X75' where oil had been contained . Oil stained material in wet area had already been removed and stockpiled on liner west of tank battery area . While on site company established syphon dams on west side of access road where oil had flowed into road ditch and north of driveway just before wet area . When I left site spill area had been secured from any further oil contamination . 9-9-05(A)9
1262704906 2009-10-20 Company still removing residual oil from behind syphon dams , also still soaking oil up from inside dike area .
523474337 2012-07-16 On 7/16/2012, I completed a production well inspection status check. This well shares a tank battery and lease road with permit numbers 2-2633, 2-2605, and 2-2925. My inspection found the well was a pumping unit that was in good condition, the proper identification was posted, and located north-west of the tank battery. The tank battery contained three 100 barrel oil/brine storage tanks with the proper identification posted and a separator, I noticed no visible spills or leaks. The lease road was in good condition, there are no violations at this time.
906262701 2009-10-13 FOLLOW UP TO NOV # 1256733402 Arrived on site to find company in process of cleaning up oil stained material from inside dike area . After conf. With company and inspection of dike and spill area , there was approx. 50 bbl. Of oil overfiowed inside dike