If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-22669 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.3003552864,"lon":-80.5261556156,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 1985-01-11 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 1 | |
Latitude: 41.3003552864 | |
Longitude: -80.5261556156 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1809094991 | 2013-03-20 | My inspection found the weeds and small trees still located around the tank battery. The dike I requested to be built around the tank battery and separator on 10/18/2012 was not built. I called Jamie Campbell at 440-858-7252. He said he did not remember that I requested a dike to be built. Jamie said that he would contact Bob Barr Jr. about the dike request. I informed Jamie that I was issuing a compliance notice. I took photos of the tank battery and separator to document their condition. | 9-9-05(A)9 | |||
1363959664 | 2012-10-18 | My inspection found this well in production. The well was equipped with a 4" concoil unit. The tank battery contained one, rusty, 100 barrel production tank and one, rusty, 50 barrel brine tank. It was surrounded by a very weathered dike not capable of containment requirements. There was a pond within 25' to 30'. There were weeds, small trees, and debris around the production and brine tank. There was a plug in the load line. The heat treated separator had the correct spacing from the tank battery. A stenciled identification sign was posted on the production tank with half of the required information. The lease road was in good, stable condition and shared with permit number 2-2668. According to our database, the last reported production was in 2010. I called Big Sky at 740-624-0434. I instructed Big Sky to remove the weeds and small trees from around the tank battery. Also, I told them to build the proper dike around the tank battery and separator. | ||||
PL3656 | Preliminary Restoration done information from Data Point |