34-153-23073

Well Details

Well ID: 34-153-23073
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-12-05
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 41.0285324035
Longitude: -81.500415283

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-400374413 2013-12-05 I was on location to inspection the construction and lining of the working and blow pits. Rose Construction , Inc dug the pits and upon my observing I approved the lining of the pits. The pits were free of any rocks, sticks and / or other material which would comprise the integrity pits. No violations observed.
1396884989 2014-04-07 I observed the stimulation of this well on 4/7/2014. Producers Service Corp. hydrofractured this well with gelled water and 700 sacks of sand. The well broke down at 1324 psi. Well treated at 1650 psi @ 31 Bbl./min. Total job volume 93243 Bbl of water. No violations were found.
1765934904 2013-12-06 I was on location to observe the cementing the Conductor casing. Wildcat Drlg. drilled a 11" hole to 90' ( checking for possible mine void, none encountered ) then reamed the hole to 60' with a 17" bit. Petroset Cementing Services cemented 11.75" casing @ 42' with 225 sacks of Class A, #% CaCl2, 1/4 lbs. celloflake per sack. Broke circulation with 200lbs. Gel and 50 lbs. cottonseed hulls. Water temp. was 46 degrees, pH-7. I observed cement returns amounting to approx. 5 Bbls. circulated to the pit. Wait on cement ( WOC ) time given was eight hours. I did not observe any violations.
850655122 2013-12-18 I inspected the pit solidification of the drilling pits at the Lightner # 1. Rose Excavating was the Contractor with Chem- Tech Inc. supplying the solidification material. At the time of my visit 48 tons of material had been delivered with another 48 tons on the way. The material appears to be bind the cuttings satisfactory.