X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-035-22162

Well Details

Well ID: 34-035-22162
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2010-05-19
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 41.5336972955
Longitude: -81.4807897466

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1014694385 2013-01-14 The producing unit is comprised of the following elements: a two-tank battery, mechanical separator, and a wellhead with a mechanical plunger lift affixed to the production casing. The tank battery and wellhead are in separate 8-foot board-on-board enclosures. The well is currently in production. The spacing within the tank battery and between the unit elemetns is in accordance with 1509:9-9-05 . Unit identification is present and legible at the tank battery. The tank battery secondary containment is adequate. I did not observe any leaks, spills, or other signs of contamination. The gates are locked.
-1324368351 2010-05-24 On site for long string cement job. Hole #3 7.875 inches in diameter, total depth 3510 feet. 4.5 inch casing set at 3447.50 casing was new R-3 11.6 lb pipe. Top of the Lockport was 2812'. Cement fill up needed 798 feet, 798 X .2278 / 1.61= 112.9 sacks of cement. Operator ran 200 sacks of Unitropic 10-4-2 cement. Operator broke circulation and conditioned the hole with 5 joints of pipe remaining to be ran. Operator completed running pipe, broke circulation and ran cement. Operator displaced cement and locked down plug with 1500psi. No circulation issues during displacement.
-1604602156 2010-05-19 area around well fenced.
-902249300 2010-05-20 On site for BOP test. Operator pressured bladder to 375 psi, bore hole to 90 psi. Zero loss of pressure during 15 minute test. Berea on the surface was 93 top and 123 bottom. Pits were in good repair. Permit posted in the dog house.
1274357055 2010-05-19 On site for CND cementing. Roy Poulson on site. Operator stated that they hit a pocket of gas at 31 feet. Hole had bubbling and a gas odor. Operator had the hole loaded with fluid and the had dammed off the flow ditch and filled it with drilling fluid.
35665207 2010-05-21 Drill depth 1173 feet. Safety fence is up. Operator has installed straw bails on the north and south side of the site. Silt fence still needs to be installed. Top of the air body was leaking fluid. Operator was drilling on air/fluid mix. Operator will repair air body when switching over to fluid. Lease road is stable. Hand rails are up on rig. No fuel leaks observed. Pits were in good repair.
482155376 2010-06-01 logging company on site rigging up to run bond log, phone call from company advising me pressure from five day test has been 0 PSI for all five days.
861167710 2010-10-13