If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22968 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.0179401791,"lon":-81.5581874407,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2006-08-30 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 41.0179401791 | |
Longitude: -81.5581874407 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1053097687 | 2006-09-06 | Status check inspection found no violations. Union should finish the 9-7/8" hole in the next few days. | ||||
-1115146998 | 2011-10-11 | This inspection was completed as part of the required five year mechanical integrity test (MIT). The test well is the 7" production casing in Akron #75. The reference well was the 7" casing in Akron #74 (PN-2967). The test began at 07:00 am and was concluded at 3:00 pm on 10/11/2011. The first pressure difference between the test well and the reference well was 424.071 psi. The final pressure difference between the test well and the reference well, eight hours later was 424.069 psi. Based on the pressure change from start to finish, the Akron 75 well easily passes this MIT. | ||||
-1293828886 | 2013-06-24 | The well was properly identified. My inspection was accompanied by Andrew Adgate. | ||||
-1478332437 | 2006-09-12 | The MIT was successfully completed on the 7" production casing. The initial shut in pressure was 560 psi with no change after 5, 10 and 15 minute intervals. | ||||
-1871638510 | 2009-06-18 | Columbus requested an annual inspection of the solution mining wells. This inspection found no violations at this time. | ||||
-399983951 | 2008-12-31 | Annual status check inspection found no violations at this time. | ||||
1089762204 | 2007-07-25 | Preliminary restoration is approved. | ||||
1159994592 | 2006-09-27 | The drilling rig has moved off and the site has been rough graded. The small cementing pit has also been closed. No violations at this time. | ||||
1733966972 | 2007-05-16 | Preliminary restoration is due this month. The site still needs to be finish graded, topsoil spread, seeded and mulched. | ||||
1786677391 | 2006-09-21 | Union Drilling has finished drilling and is starting to move off site. | ||||
1827656906 | 2010-08-03 | Annual inspection of this solution mining well found no violations at this time. |