Well ID: 34-133-23966 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.1541803559,"lon":-81.2181875969,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2008-12-10 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 3 | |
Latitude: 41.1541803559 | |
Longitude: -81.2181875969 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1031449125 | 2008-12-15 | HAD Drilling has completed the hole and is running 4-1/2" casing. The pits are lined and partially fenced. The fencing will be completed after the rig has moved off location. | ||||
-1254303874 | 2010-03-16 | The required ID has been posted and the fence was installed temporarily. A second production tank has since been installed and the fence has been partially removed. The well must be shut in until the fence is replaced. The required filtration and safety equipment has not been installed and the preliminary restoration is still a long way from being approved. Restoration will be completed as soon as the weather permits. | ||||
-2005221168 | 2008-12-10 | HAD Drilling is rigging up and the pits are being dug. Should be ready to spud later today. | ||||
-258367416 | 2009-02-24 | The well has been fraced and rods have been run. Preliminary restoration should be completed by late spring. | ||||
-751575305 | 2009-12-22 | The required identification is posted and the security locks are in place, for partial compliance. The vapor control system required by HB278 is still missing and preliminary restoration is still due. | ||||
-919603140 | 2008-12-17 | HAD Drilling has moved off site. The pits are lined and in good condition but need to be fenced off completely. I called Bob Lindsey and told him to fence the pits immediately. He agreed. The pits are scheduled to be solidified later this week. | ||||
1111669111 | 2009-12-01 | This status check inspection for preliminary restoration, which was due mid September found numerous violations. 1) failure to restore the land surface within 9 months, the affected area needs to be graded, seeded and mulched. 2) the required identification needs to be posted on either the wellhead or the tank battery. 3) the gates on the fences around the wellhead and the tank battery need to be locked and secured at all times. 4) the production system does not have the required filters and safety equipment. The well is in production and violations 2 through 4 need to be addressed immediately. | 9-9-02 | |||
1111669111 | 2009-12-01 | This status check inspection for preliminary restoration, which was due mid September found numerous violations. 1) failure to restore the land surface within 9 months, the affected area needs to be graded, seeded and mulched. 2) the required identification needs to be posted on either the wellhead or the tank battery. 3) the gates on the fences around the wellhead and the tank battery need to be locked and secured at all times. 4) the production system does not have the required filters and safety equipment. The well is in production and violations 2 through 4 need to be addressed immediately. | 9-9-05(A)10 | |||
1111669111 | 2009-12-01 | This status check inspection for preliminary restoration, which was due mid September found numerous violations. 1) failure to restore the land surface within 9 months, the affected area needs to be graded, seeded and mulched. 2) the required identification needs to be posted on either the wellhead or the tank battery. 3) the gates on the fences around the wellhead and the tank battery need to be locked and secured at all times. 4) the production system does not have the required filters and safety equipment. The well is in production and violations 2 through 4 need to be addressed immediately. | 9-9-05(D) | |||
126331941 | 2008-12-22 | One load of cement dust has been delivered and blown into the working pit. The dust will be transferred to the blow pit by the track hoe. I suggested that they leave the pits open over night to see how well they solidify before covering over. | ||||
1342545908 | 2009-12-01 | FOLLOW UP TO NOV # 1111669111 This status check inspection for preliminary restoration, which was due mid September found numerous violations. 1) failure to restore the land surface within 9 months, the affected area needs to be graded, seeded and mulched. 2) the required identification needs to be posted on either the wellhead or the tank battery. 3) the gates on the fences around the wellhead and the tank battery need to be locked and secured at all times. 4) the production system does not have the required filters and safety equipment. The well is in production and violations 2 through 4 need to be addressed immediately. | ||||
1783018399 | 2009-03-17 | The well has been fraced and tubing run in the hole. The tank battery is in position but has not been hooked up nor has the Dominion tap been made. Preliminary restoration is not due until September 2009. | ||||
1896365163 | 2008-12-09 | HAD Drilling is starting to move on the location. Still need to dig pits but should spud the well tomorrow. | ||||
2004056716 | 2008-12-23 | The drilling pits have been covered over. | ||||
322045758 | 2012-08-01 | FOLLOW UP TO NOV # 1342545908. This status check found that the site had been remediated to pass preliminary restoration. The wellhead and tank battery are fenced and locked and ID signs are are up on both. Charcoal filters are missing from the tank stacks and are not necessary at this location. The well is running on a plunger lift system with 220 psi on the tubing and 240 psi on the 4.5" casing. The tank battery consists of 1-210 barrel tank, 1-140 barrel tank, a 50 barrel poly tank, and a separator. There is a domestic hook up on the well with 15 psi. The equipment has been freshly painted. No violations. | ||||
322045758 | 2012-08-01 | FOLLOW UP TO NOV # 1342545908. This status check found that the site had been remediated to pass preliminary restoration. The wellhead and tank battery are fenced and locked and ID signs are are up on both. Charcoal filters are missing from the tank stacks and are not necessary at this location. The well is running on a plunger lift system with 220 psi on the tubing and 240 psi on the 4.5" casing. The tank battery consists of 1-210 barrel tank, 1-140 barrel tank, a 50 barrel poly tank, and a separator. There is a domestic hook up on the well with 15 psi. The equipment has been freshly painted. Preliminary restoration is approved. No violations. |