Well ID: 34-099-21956 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 1985-09-17 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 7 | |
Latitude: 40.9037433341 | |
Longitude: -81.0170717072 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1003736175 | 2003-08-21 | Last inspection date 06/09/03. | ||||
-1128755445 | 2012-03-14 | No violatons were found at the time of my inspection of this well site. | ||||
-113646822 | 2014-06-26 | An inspection of the well and injection facility found no violations. | ||||
-119796455 | 2009-03-04 | I visually inspected the 4 1/2" Halliburton R-4 packer. The rubber, springs and slips were new. I witnessed the running in the well with 156 joints(4760.45'). of 2 3/8" tubing. There was 5 feet of 2 3/8" tail pipe below the packer. With the packer unset, Dorfman pumped 50 barrels of pipe coat(packer inhibitor) down the annulus and up the tubing. The tubing was set in 10,000# tension and the wellhead was packed. The packer top is set at 4763.45'. The annulus was pressure tested to 1,200psi. Lost 60 psi within 5 minutes. Pressure tested two more times. Same result. Will let the the fluid set overnight. Shut the well in for the night. | ||||
-1362847384 | 2005-08-22 | The last inspection was 06/21/2005. | ||||
-1367215386 | 2006-08-31 | The system was not running at the time of the inspection. There were no violations at the wellhead or at the tank battery. The area around the wellhead needs some general cleaning up. | ||||
-1438274822 | 2003-06-09 | Contaminated material and old dike have been removed. The last inspection was 04-09-2003. Recommend case be resolved/ | ||||
-1578442352 | 2005-06-21 | The last inspection was 04/06/2005. | ||||
-1643681638 | 2007-12-04 | I performed the quarterly UIC test. I checked the wellhead and tank battery. The injection well was not in operation. There were no violations at this time. | ||||
-1652995301 | 2009-12-01 | I performed the quarterly UIC test. The well was not running. There were no violations at this time. | ||||
-1733703304 | 2010-03-01 | I performed the quarterly UIC test. The well was running. I tested the annulus and the tubing. Both were over the Maximum injection pressure. The annulus was 1340psi and the tubing was 1260 psi. I called Paul Shaw(Dorfman Field Supervisor 330-284-2045) and wanted him to meet me at the location. Paul witnessed my readings again and shut the well in. I called the Columbus office and reported it to Tom Tomastik. Paul will talk to Greg New to find out when they can get on this well. Paul wants the ground to freeze more. This case continues. | ||||
-1764030303 | 2003-12-24 | The last inspection was 10-16-2003. | ||||
-2002082187 | 2005-11-16 | The well was last inspected on 08-22-2005. | ||||
-2114615896 | 2006-05-01 | The last inspection was 02-06-06. | ||||
-2144566302 | 2008-06-05 | I performed the quarterly UIC test. The well was running. The wellhead and the tank battery were in good shape. I found no violations at this time. | ||||
-305222554 | 2010-03-02 | Paul Shaw from Dorfman called to let me know that a rig will be coming to the location on Thursday, March 4, 2010 to repair the well. I emailed Tom Tomastick about the repair date. This case continues. | ||||
-392648281 | 2004-06-21 | The last inspection was 04-14-04. | ||||
-483014401 | 2003-10-16 | The last inspection was 08/21/03. | ||||
-634355622 | 2012-08-23 | On 8/23/2012, DNR Inspector Steve Ochs and myself did an inspection on the above location, upon our inspection around the in-ground condiment area we noticed cracks in the north and south east wall corners and also a crack in the concrete floor. On 8/24/2012 I called Gregg New of ( Dorfmann Production ) about this problem and requested that these repairs be made. I will do a fellow up on this inspection. | ||||
-702557196 | 2003-02-21 | The old storage facility and contamination has not been removed as yet. The last inspection date 12/04/2002. Case pends. | 9-3-05(A)6 | |||
-72170650 | 2009-03-05 | Pressure tested to annulus to 1200psi. Lost 60 psi in 7 minutes. Released packer and reset in 12,000# tension. Pressure tested again to 1200psi. Lost 10psi in 5 minutes. Lost 47 psi in 15 minutes. This UIC passes. Phil's Well Service rigged down. This NOV/Chief's order 2008-97 resolved. | ||||
-87148962 | 2003-04-09 | The old tank battery facility has not been removed and the land restored. This needs to be addressed to avoid further action. Last inspection 02/21/03. | 9-3-04(A) | |||
-962255763 | 2013-05-08 | I performed the quarterly UIC Inspection on the above location. The well was in operation at this time. There is no violation noted at this time. | ||||
1108145019 | 2005-02-09 | The last inspection was 11-16-2004. | ||||
1153884917 | 2004-08-26 | Last inspection 06/21/2004. | ||||
1172175790 | 2007-02-13 | Performed a status check on the well and tank battery. Needle valves have not been replaced. Called Paul Shaw, 330-284-2045 and discussed my findings. He will notify my when the new needle valves are installed. | ||||
1174650881 | 2007-03-21 | Dave Claus and I went to perform the quarterly UIC test. Checked the wellhead and tank battery. The injection well was not injecting fluid. There were no violations at this time. | ||||
1174872329 | 2012-08-23 | My inspection of the well site and injection facility was accompanied by another inspector, John Fleming.
The concrete of the unloading pad and tank battery needs cleaned and sealed. John Fleming notified the well owner. |
||||
1204572849 | 2008-03-03 | I performed the quarterly UIC test. Both the wellhead and the tank battery were GPS'd. The tank battery and the well were in good shape. The unit was not running. There were no violations at this time. | ||||
1216i105 | 2001-11-28 | No violations. Last inspection date:07-31-2001. | ||||
1216i265 | 2002-03-04 | The unloading pad was full of water upon arrival however this was corrected while the inspection was being conducted. No violations this date. Last inspection 01-02-2002. | ||||
1216i387 | 2002-04-18 | Not running this date. Last inspection 03-04-2002. | ||||
1216i840 | 2002-08-14 | Well is shut in. No pressure taken this date. Contamination is partiall removed. Entirely new storage facility is being constructed. See permit 0972 for details. | ||||
1216i956 | 2002-10-17 | Old tank battery has not been reclaimed. Three tanks to be emptied. Last inspection 09/11/2002. Case pends. | 9-3-05(A)6 | |||
1220896596 | 2008-09-08 | I performed the quarterly UIC test. The well was running. I walked around the wellhead and the tank battery and found no violations at this time | ||||
1224892034 | 2011-03-01 | I performed the quarterly UIC test on the annulus and the injection. The well was not running. There were no violations at this time. | ||||
1228669614 | 2008-12-04 | I performed my quarterly UIC testing. My witness was Paul Shaw who is Dorfman's field superintendent. The annulus read 880psi and the tubing read 820psi. The well was not running at the time. I emailed Tom Tomastik about the failure. The annulus had the pressure released down to 200psi. The annulus increased to 880psi. Tom Tomastik was called. Tom would start the Chief's Order for this well. This well is shut in until repaired. Greg New was called and told of this. The well would try and be repaired in January. | 9-3-05[C] | |||
1236101968 | 2009-03-03 | Phil's Service rig #1 rigged up on the wellhead. I GPS'd both the well and the tank battery. A small pit was dug. The liner was installed. There was a liner installed around the wellhead to keep the brine from filtering down in the ground. I witnessed the rig unseating the packer and pulling out of the hole with 2 3/8" tubing. There were joints of tubing that had bad threads and one joint had a hole in it. I also witnessed the visual inspection of the 4 1/2" R-4 packer. The rubber was bad. Tomorrow the rig will run into hole with new and used 2 3/8"tubing | ||||
1239885707 | 2012-06-22 | My inspection found no violations at the wellhead or at the brine tank battery. The injection system was not running at the time of inspection. | ||||
1267725840 | 2010-03-04 | I witnessed the unseating of the 4 1/2" Halliburton R-4 packer and pulling out of the hole with the 2 3/8" tubing. The threads on some of the 2 3/8" tubing were gone. Corrosion. The rubber on the packer was torned in half. | ||||
1268055826 | 2010-03-05 | Witnessed the running into the well with 4 1/2" Halliburton R-4 packer and 2 3/8" upset tubing. Started to pump the inhibitor. Had pen hole leak below the 4 1/2" casing threads. Will call a welder to cut the 4 1/2"casing. Shut down for the night. | ||||
1268141275 | 2010-03-08 | I witnessed the welder welding the 4 1/2" collar on the 4 1/2" casing. Dorfman pumped Chem Tech Inc 700 inhibitor treatment chemical down the backside and up through the tubing until the packer fliud came out in the pit. I witnessed the setting of the 4 1/2" Halliburton R-4 packer. It was set in 9,000lb tension. The pump truck pressured the backside to 1200 psi. It lost ) psi in 5 minutes. It lost 0 psi in 15 minutes. This well passes MIT. I emailed Tom Tomastik. This well is ready to be back on line. | ||||
1291317760 | 2010-12-02 | I performed the quarterly UIC test on the annulus and the injection. The well was not running. There were no violations at this time. | ||||
1356361594 | 2012-12-18 | On 12/19/2012, I performed an inspection on the above location, there was a small leak noticed on the 210 barrel tank at the 5' weld. The tank is inside the contained area. I called Greg New to let him know, he said it would be fixed. I will do an inspection on 1/4/2013. | ||||
1407226224 | 2002-12-04 | Contamination at the old tank battery has not been removed. Part of the old tank battery remains. Case pends. Last inspection date 10/17/2002. | 9-3-04(A) | |||
1442175960 | 2006-02-06 | The last inspection date was 11-16-2005. | ||||
1494755012 | 2011-12-15 | I performed the quarterly UIC test on the annulus and the injection. The well was not running. There were no violations at this time. | ||||
161434522 | 2011-09-07 | I performed the quarterly UIC test on the annulus and the injection. The well was not running. There were no violations at this time. | ||||
1632347275 | 2005-04-06 | The last inspection was 02-10-2005. | ||||
1992775724 | 2009-06-01 | I performed the quarterly UIC test. The well was not running. I walked around the wellhead and the tank battery and found no violations at this time | ||||
2011518930 | 2007-06-05 | I performed the quarterly UIC test. Checked the wellhead and tank battery. The injection well was not in operation. There were no violations at this time. | ||||
2119493419 | 2009-09-08 | I performed the quarterly UIC test. The well was running. There were no violations at this time. | ||||
459124596 | 2011-06-03 | I performed the quarterly UIC test on the annulus and the injection. The well was not running. There were no violations at this time. | ||||
482473878 | 2010-09-09 | I performed the quarterly UIC test on the annulus and the injection. The well was not running. There were no violations at this time. | ||||
638 | 2002-06-20 | Remove the free oil and contaminated material inside the tak battery dike. Stop the loss of salt water to the ditch behind the unloading pad. Remove the brine from the unloading pad and pump the underground storage tank for the unloading pad. | ||||
718389934 | 2010-06-01 | I performed the quarterly UIC test on the annulus and the injection. The well was not running. There were no violations at this time. | ||||
768663307 | 2004-11-16 | Last inspection 08/26/2004. | ||||
82207350 | 2013-10-28 | I performed a status check on the above location. This injection well is in operation. All permits are posted. Location is clean. They replaced one of the 210 barrel tanks with a new inside lined 210 barrel tank on 10/25/2013. No violations were noted at this time. | ||||
860582755 | 2007-09-26 | I performed the quarterly UIC test. GPS'd both the well and tank battery. Checked the wellhead and tank battery. The injection well was not in operation. There were no violations at this time. | ||||
933499450 | 2004-02-05 | The last inspection date 12/24/2003. | ||||
982275376 | 2014-03-31 | The were no violations at the time of inspection. | ||||
PL12800 | Preliminary Restoration done information from Data Point | |||||
UIC1491 | 1994-05-02 | 1501: 9-3-07 (D) EXCEED MAX. INJ. PSI | ||||
UIC1492 | 1994-05-02 | 1501: 9-3-06 EXCEED MAX. INJ. PSI | ||||
UIC1550 | 1994-10-28 | 1501: 9-3-04 PREVENT CONTAMIANTE | ||||
UIC1551 | 1994-10-28 | 1509.072 RESTORATION | ||||
UIC1570 | 1995-04-20 | 1501: 9-1-07 PREVENT CONTAMINATE | ||||
UIC1571 | 1995-04-20 | 1501: 9-3-04 (A) PREVENT CONTAMINATE | ||||
UIC1572 | 1995-04-20 | 1501: 9-3-08 TEMPORARY STORAGE | ||||
UIC1573 | 1995-04-20 | 1501: 9-3-07 OPERATION | ||||
UIC1574 | 1995-04-20 | 1501: 9-1-07 PREVENT CONTAMINATE | ||||
UIC1575 | 1995-04-20 | 1501: 9-3-04 (A) PREVENT CONTAMINATE | ||||
UIC1666 | 1997-04-18 | 1509.03 EXCEED MAX. INJ. PSI | ||||
UIC1784 | 1999-07-06 | 1509.05 REPLACE VALVE | ||||
UIC1797 | 1999-07-06 | 1509.03; 1501:9-3-05(B4) REPLACE FITTING | ||||
UIC1811 | 1999-11-16 | 1509.22; 1509.03 POLLUTION | 22(A) | |||
UIC1811 | 1999-11-16 | 1509.22; 1509.03 POLLUTION | 3 | |||
UIC885 | 1990-04-13 | 1501:9-3-05 (6) CONSTRUCT & CONVERT | ||||
UIC886 | 1990-04-13 | 1501:9-3-04 PREV. & CONTAIMINATI |