{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.2281174307,"lon":-80.8765011798,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 1995-03-22 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 57 | |
Latitude: 41.2281174307 | |
Longitude: -80.8765011798 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1020567325 | 2004-06-21 | 9-3-04(A) | ||||
-1041695790 | 2003-12-22 | The last inspection was 10-16-2003. The well was operating this date. | ||||
-1148943786 | 2007-05-01 | Check UIC facility . | ||||
-119261113 | 2008-09-04 | Tok photos of tank battery . | ||||
-126742416 | 2011-07-21 | Land owner claimed that the company was pumping waste water into the concrete dike at the injection facility. At the time of inspection, company workers were found pumping from a frac tank into a 210 bbl. tank . There was no water inside the dike. No violations found at the time. | ||||
-1476213930 | 2012-02-01 | The measured pressure on the tubing was 1,330 PSI, which is over the maximum allowable injection pressure. The well was shut down. | 9-3-07(D) | |||
-1501219609 | 2008-03-06 | no violations . | ||||
-1534310279 | 2010-08-13 | check uic facility. | ||||
-1579418342 | 2012-08-20 | My inspection of the well site and injection facility was accompanied by another inspector, Tom Hill.
There were no violations at the time of inspection. |
||||
-1623789924 | 2007-08-06 | check uic facility . | ||||
-1650128200 | 2013-02-23 | My inspection of the injection well and surface facility was accompanied by Stephen Tompkins. The gate was locked. The well was not in operation. The water level in the sump was about 10 inches from the top. There was no activity on site. | ||||
-1671237801 | 2012-05-31 | My inspection of this well site found no violations at the time. | ||||
-1718060982 | 2003-04-09 | Last inspection date 02/21/2003. | ||||
-1730975866 | 2009-10-16 | check uic facility . | ||||
-1852868780 | 2012-11-01 | My inspection of the injection facility and well found no violations. The pump was operating, while the pressures were gauged. | ||||
-191905519 | 2013-05-14 | The well is not permitted. The gate was locked. There were no signs of recent activity. There were three to four inches of rainwater inside the tank battery dike.
My inspection of the well and surface facility found no additional problems. |
||||
-2112499505 | 2011-09-08 | There were no violations found at the time of my inspection. | ||||
-219651471 | 2006-01-04 | check uic facility . | ||||
-238619688 | 2003-07-14 | On 7-14 met with Jay Cheslock to go over the removal of contamination outside the dike and pump house. Case pends | 9-3-04(A) | |||
-413666230 | 2012-07-27 | My inspection of the well site and injection facility found no violations. The pump was operating at the time. | ||||
-422361732 | 2005-04-06 | The last inspection date was 02-09-2005. | ||||
-46501312 | 2012-03-07 | There were no violations at the time of inspection. | ||||
-472022639 | 2010-01-19 | no violations . | ||||
-49484551 | 2003-07-15 | Monitored the removal of contaminated material. Case pends. | 9-3-04(A) | |||
-654336002 | 2003-06-09 | Last inspection date:04-09-03. | ||||
-768915315 | 2013-04-01 | The permit was revoked. The well was shut-in. The pump house and gate were both locked. About two inches of rainwater was inside the tank battery dike and on the unloading pad. The level inside the crock was approximately one foot from the top. There were no signs of activity. | ||||
-814020191 | 2003-10-16 | The last inspection date was 08/28/03. | ||||
104477716 | 2002-10-29 | Meets requirements. Inspected at the request of OEPA for H2S leak. Negative. This well remains in violation for packer failure and is shut in. Case pends. | ||||
1045058736 | 2003-02-10 | Arrived on site this date for M.I.T. Learned that the sand pump had trouble at approximately 150'. Ran packer on six joints hid solid. Pulled out and ran open end tubing into the casing to 1500'. Flushed out the blockage which was a semi-solid black material commonly referred to as inner face between the oil and water. Ran a wire line to ensure that the casing was open to the bottom. Hit an obstruction at 2932'. Was then informed that the packer was pulled apart when it was removed and that the rubber and slips were still n the casing. The company will come back tomorrow and run in with a drill stem and jars to try to push the obstruction to the bottom. Tentatively scheduled for 08:00 AM Friday to try again. Case ponds. | 9-3-07(D) | |||
1045586075 | 2003-02-14 | New packer and tubing in the hole. MIT test passed. 1080psi held for fifteen minutes with no loss in pressure. The pressure was not released prior to departure. Will check the pressures again next week when normal SWIW inspections are conducted. Recommend case be resolved. | ||||
1062161317 | 2003-08-28 | Inspection this date revealed that the pressure remains above the maixmum allowable. The well is not operating at this time. | 9-3-07(D) | |||
1063196081 | 2003-08-22 | Last inspection 06/09/2003. The allowable pressures have been increased. | ||||
1075283785 | 2013-01-04 | My inspection of the injection facility and well found no violations. | ||||
1077642807 | 2004-02-20 | 9-3-05(A)6 | ||||
1077642807 | 2004-02-20 | 9-3-07(D) | ||||
1077642807 | 2004-02-20 | 9-3-07(E) | ||||
1077642807 | 2004-02-20 | 9-3-07(H) | ||||
1079549846 | 2004-03-15 | 9-3-05(A)6 | ||||
1079549846 | 2004-03-15 | 9-3-07(D) | ||||
1079549846 | 2004-03-15 | 9-3-07(E) | ||||
1086198 | 2004-04-14 | |||||
1087928303 | 2004-06-17 | Follow up to Rick Simmers initial response. Observed the pumping of the pond and removal of all contaminationin and around the pond area. Removal of the buried tank outside the tank battery dike. Stockpiled and solidified the soils. Chief's Order 2004-56 Issued to cease all injection operations. | 9-3-04(A) | |||
1088514020 | 2004-06-28 | |||||
1100522780 | 2004-11-12 | Arrived on site and checked the wellhead and annulus pressures and found them to be equal. Contacted Tom Tomastik to issue a chief's order. Met on site with company representatives | 9-3-07(F) | |||
1100781781 | 2004-11-15 | The dike at the wellhead has been opened in preparation for the removal of the packer. Case pends. | 9-3-07(E) | |||
1125665822 | 2005-08-29 | Arrived on site and found that the dike around the pump house and wellhead had been breeched allowing salt water to escape to the north. The area affected is 285 feet to the north then 393 feet to the northwest. The width is from 3 feet to 75 feet. The un | 9-3-04(A) | |||
1125665822 | 2005-08-29 | Arrived on site and found that the dike around the pump house and wellhead had been breeched allowing salt water to escape to the north. The area affected is 285 feet to the north then 393 feet to the northwest. The width is from 3 feet to 75 feet. The un | 9-3-05(A)6 | |||
1125665822 | 2005-08-29 | Arrived on site and found that the dike around the pump house and wellhead had been breeched allowing salt water to escape to the north. The area affected is 285 feet to the north then 393 feet to the northwest. The width is from 3 feet to 75 feet. The un | 9-3-07(F) | |||
1127747599 | 2005-09-23 | Arrived on site this date and found that the company had started to remove the contamination from inside the dike. Case pends. | 9-3-04(A) | |||
1127747599 | 2005-09-23 | Arrived on site this date and found that the company had started to remove the contamination from inside the dike. Case pends. | 9-3-05(A)6 | |||
1127825851 | 2005-09-26 | The contamination has been removed from inside the dike and to the north of the dike to the woods line. The company must obtain permission to go onto the property to the west before cleanup can take place. The inside of the dike is to be redone next. The | 9-3-04(A) | |||
1127825851 | 2005-09-26 | The contamination has been removed from inside the dike and to the north of the dike to the woods line. The company must obtain permission to go onto the property to the west before cleanup can take place. The inside of the dike is to be redone next. The | 9-3-05(A)6 | |||
1128516260 | 2005-10-04 | Arrived on site and found that the dike has been replaced. Contaminated material is under cover and awaiting removal. A quantab titrator in a puddle at the woods to the north indicated 4042 ppm cl. Will contact Dave Rice and have more material removed. | 9-3-04(A) | |||
1128516260 | 2005-10-04 | Arrived on site and found that the dike has been replaced. Contaminated material is under cover and awaiting removal. A quantab titrator in a puddle at the woods to the north indicated 4042 ppm cl. Will contact Dave Rice and have more material removed. | 9-3-05(A)6 | |||
1130520556 | 2005-10-28 | Arrived on site this date to check on cleanup progress. The stockpile of contaminated soil is not covered. The stockpiled contaminated gravel is not covered. Quantab titrators indicated: that the water area 60 yards north of the pump building is 413 ppm cl. | 9-3-04(A) | |||
1130520556 | 2005-10-28 | Arrived on site this date to check on cleanup progress. The stockpile of contaminated soil is not covered. The stockpiled contaminated gravel is not covered. Quantab titrators indicated: that the water area 60 yards north of the pump building is 413 ppm cl. | 9-3-07(H) | |||
1149328841 | 2004-06-25 | 9-3-04(A) | ||||
115883708 | 2006-08-31 | check uic facility . | ||||
1210180770 | 2008-12-10 | check uic facility . | ||||
1216i939 | 2002-10-07 | Non-compliance. The well remains shut in. No MIT test. One pile of contaminated soil removed. Two more are covered with plastic awaiting removal. Buril of vault not done. Checked annulus pressure on the 8 5/8 regarding the Smith water well complaint. Pressure is 80 psi. | 9-3-04(A) | |||
1216i939 | 2002-10-07 | Non-compliance. The well remains shut in. No MIT test. One pile of contaminated soil removed. Two more are covered with plastic awaiting removal. Buril of vault not done. Checked annulus pressure on the 8 5/8 regarding the Smith water well complaint. Pressure is 80 psi. | 9-3-05 C | |||
1216i939 | 2002-10-07 | Non-compliance. The well remains shut in. No MIT test. One pile of contaminated soil removed. Two more are covered with plastic awaiting removal. Buril of vault not done. Checked annulus pressure on the 8 5/8 regarding the Smith water well complaint. Pressure is 80 psi. | 9-3-07(H) | |||
1216i961 | 2002-10-17 | All contaminated material has been removed. The MIT test has not been done. Last onspection 10-07-2002. Case pends. | 9-3-05 C | |||
1292614935 | 2006-04-26 | Check UIC facility . | ||||
1309459461 | 2011-05-12 | There were no violations at the time of inspection. | ||||
1313436981 | 2011-08-15 | The frac tank was removed from the well site. The oil clean up was completed. Inside the concrete dike and the unloading pad were steam cleaned.
A company representative was instructed to remove rain water from the unloading pad. |
||||
1313588847 | 2011-08-16 | There were no frac tanks at the facility and clean-up of the area was completed. The unloading pad was clear and the drain and sump were empty. | ||||
1315504114 | 2011-08-08 | My inspection found oil coating the ground outside the dike where trucks were unloading into a frac tank. I instructed the company representative to clean-up the oil and remove the frac tank. | 9-3-04(A) | |||
1315504114 | 2011-08-08 | My inspection found oil coating the ground outside the dike where trucks were unloading into a frac tank. I instructed the company representative to clean-up the oil and remove the frac tank. | 9-3-07(H) | |||
1340990139 | 2012-06-28 | DNR Inspector Tom Hill and I took water samples from a brine truck that arrived at the injection facility. The truck (truck number 1821), operated by Liquid Luggers (Underground Injection Control number 25453), was hauling flow-back from a well (American Petroleum Institute number 34-013-2-0660-00-00) in Belmont County, Ohio. The samples were sent to the Cambridge laboratory for analysis. | ||||
1357584711 | 2004-08-12 | The last inspection was 06/28/2004. | ||||
1360002881 | 2013-02-02 | The front gate was locked. There was no activity on location. The pump was operating, while the pressures were gauged. My inspection of the injection facility and well found no violations. | ||||
1364342464 | 2013-02-23 | The front gate was locked and the pump was shut down. There was no signs of activity. | ||||
1366030824 | 2004-06-24 | 9-3-04(A) | ||||
1413287615 | 2011-10-05 | Company representative was told to cease operation immediately. | 9-3-07(D) | |||
1542608333 | 2002-12-04 | Order no. 2002-51 Suspension order remains in effect pending a M.I.T. Well remains shut in. Case pends. Last inspection date 10/17/2002. | 9-3-07(D) | |||
1550067097 | 2008-06-06 | check uic facility . | ||||
1571394300 | 2012-11-20 | My inspection of the injection facility and well found no violations. | ||||
1610103910 | 2011-11-03 | The pump was not in operation. There were no violations at the time of inspection. | ||||
1650443934 | 2012-07-09 | My inspection of the well site found no violations at the time. | ||||
1745666813 | 2008-09-25 | check uic facility , violations have been corrected . Case resolved . | ||||
1808556178 | 2005-11-18 | The piles of contaminated gravel and earth have been removed. Water puddles 60 yards northeast of the wellhead dike, (Q-1 indicateds 2.4 = 542 ppm chlorides), 90 yards north of the wellhead dike, (Q-2 indicated 4 = 1283 ppm chlorides) and the end of the run to the northwest of the property, (Q-3 indicated 2.4 = 542 ppm chlorides. | 9-3-04(A) | |||
1808556178 | 2005-11-18 | The piles of contaminated gravel and earth have been removed. Water puddles 60 yards northeast of the wellhead dike, (Q-1 indicateds 2.4 = 542 ppm chlorides), 90 yards north of the wellhead dike, (Q-2 indicated 4 = 1283 ppm chlorides) and the end of the run to the northwest of the property, (Q-3 indicated 2.4 = 542 ppm chlorides. | 9-3-05(A)6 | |||
1933742369 | 2013-06-11 | The permit was revoked on 2/6/13.
The gate was locked. There was nobody onsite. No evidence of recent activity. Two to three inches of rainwater were inside the tank battery dike. My inspection found no additional problems. |
||||
1939125872 | 2005-02-09 | Last inspection was 11-12-2004. Arrived on site and found the annulus valve was leaking. Notified Fred and Dave. The valve was replaced this date. Recommend case be resolved. | 9-3-05(B)4 | |||
1950456946 | 2009-07-27 | check uic facility . | ||||
1955627375 | 2004-02-04 | The last inspection was 12/22/2003. Found the wellhead leaking brine. Notified the company. The response was immediate and the problem was corrected in my presence. | 9-3-07(H) | |||
1972796118 | 2013-08-01 | The gate was locked. There was no activity on site. There were no additional concerns found. | ||||
1987806971 | 2008-07-24 | Inspection of UIC facility showed there was exccesive parafin inside dike walls , also there was several three inch lines connecting storage tanks were dripping brine . Further inspection showed sump tanks outside tanks were full of fluid . | ||||
2053933879 | 2011-10-17 | The pump was off at the time of my inspection. There were no violations noted. | ||||
2067176208 | 2004-11-19 | Arrived on site and observed the running in of the tubing and packer. Conducted an MIT and the welll passed. Additional report submitted. Tested at 1300 psi after fifteen minutes the pressure was 1280. The company has now complied with the chief's order. Recommend case be resolved. | ||||
2144516830 | 2005-11-30 | The contamination has beeen removed. Quantab titrators,60 yards north of the wellhead dike indicated less than 253 ppm cl, 90 yards northof the wellhead dike indicated less than 253 ppm cl and the end of the run indicated less than 253 ppm cl. Recommend cased be resolved. | ||||
254594286 | 2012-12-07 | I completed a salt water injection well inspection with ODNR Inspector Steve Ochs. My inspection found the tubing had 1,160 psi and the 4.5" had 140 psi. The injection facility was in good operating condition with no water or oil surrounding the diked tanks. | ||||
26683127 | 2011-08-23 | There were no violations found at the time of my inspection. | ||||
325223856 | 2013-08-23 | There were no signs of activity on location. There were three inches of rainwater inside the tank battery dike. No additional issues were found. | ||||
337847982 | 2007-01-04 | check UIC facility . | ||||
339235894 | 2011-06-28 | No violations were found at the time of inspection. | ||||
370580892 | 2007-11-14 | check uic facility . | ||||
376946631 | 2013-12-03 | There were no changes to the well site or facility. No sign of recent activity. | ||||
400786580 | 2014-03-05 | Permit was revoked. There was no sign of recent activity. The site appeared to be secure. No additional problems found. | ||||
461849052 | 2011-02-24 | check uic facility. | ||||
550226073 | 2004-02-12 | The last inspection was 02/04/2004. Found that the valve on the injection tubing is faulty and won't shut off. The plastic line inside the tank battery from the sump for the unloading pad is broken due to freezing and needs replaced. The receiving tank has been overfilled causing an oil spill that needs removed. There is not a cut off switch for over and under pressurization of the allowable pressures that resulted in the line freezing and breaking. | 9-3-05(A)3 | |||
550226073 | 2004-02-12 | The last inspection was 02/04/2004. Found that the valve on the injection tubing is faulty and won't shut off. The plastic line inside the tank battery from the sump for the unloading pad is broken due to freezing and needs replaced. The receiving tank has been overfilled causing an oil spill that needs removed. There is not a cut off switch for over and under pressurization of the allowable pressures that resulted in the line freezing and breaking. | 9-3-05(A)6 | |||
550226073 | 2004-02-12 | The last inspection was 02/04/2004. Found that the valve on the injection tubing is faulty and won't shut off. The plastic line inside the tank battery from the sump for the unloading pad is broken due to freezing and needs replaced. The receiving tank has been overfilled causing an oil spill that needs removed. There is not a cut off switch for over and under pressurization of the allowable pressures that resulted in the line freezing and breaking. | 9-3-07(D) | |||
550226073 | 2004-02-12 | The last inspection was 02/04/2004. Found that the valve on the injection tubing is faulty and won't shut off. The plastic line inside the tank battery from the sump for the unloading pad is broken due to freezing and needs replaced. The receiving tank has been overfilled causing an oil spill that needs removed. There is not a cut off switch for over and under pressurization of the allowable pressures that resulted in the line freezing and breaking. | 9-3-07(E) | |||
550226073 | 2004-02-12 | The last inspection was 02/04/2004. Found that the valve on the injection tubing is faulty and won't shut off. The plastic line inside the tank battery from the sump for the unloading pad is broken due to freezing and needs replaced. The receiving tank has been overfilled causing an oil spill that needs removed. There is not a cut off switch for over and under pressurization of the allowable pressures that resulted in the line freezing and breaking. | 9-3-07(H) | |||
555720867 | 2002-08-22 | Last inspection date 06/09/2003. The well was over pressure. Met on site with Well tender Fred. Well to remain shut in until pressure is below maximum allowable pressure. Fred stated too much pit water and flow back water. He will get more brine in to mix in. | 9-3-07(D) | |||
583728740 | 2012-08-15 | My inspection of the well site and injection facility found no violations. The pump was operating at the time. | ||||
605709124 | 2010-11-18 | check uic facility. | ||||
630455672 | 2013-02-07 | My inspection of well found well is not in operation at this time . No violations . | ||||
638295376 | 2004-11-10 | Checked the well pressures and found them to be equalized. Called Mr. Ben Lupo to inform him of the violation. Will check again on Friday 11-12-04. | 9-3-07(D) | |||
669232611 | 2012-02-03 | The injection pressure was measured at 1160 PSI. The pump is to be replaced. The well is in compliance. | ||||
671632548 | 2005-09-20 | Arrived on site and found a crew repairing the wellhead. Requested a meeting with Dave Rice to go over the cleanup. Explained what was expected. Case pends. | 9-3-04(A) | |||
671632548 | 2005-09-20 | Arrived on site and found a crew repairing the wellhead. Requested a meeting with Dave Rice to go over the cleanup. Explained what was expected. Case pends. | 9-3-05(A)6 | |||
684735041 | 2003-02-21 | Last inspection date 02/14/2003. Well remains shut in. | ||||
686141832 | 2014-06-18 | An inspection of the well and injection facility found no sign of recent activity. The well remains shut-in. The tank battery dike was roughly half full of rainwater. There were no additional issues. | ||||
710107400 | 2012-04-20 | My inspection of this well site found no violations at the time. | ||||
723295006 | 2008-09-03 | On site to wittness steam cleaning of tank battery area . | ||||
806412113 | 2013-01-11 | My inspection of the injection facility and well found no violations. | ||||
820105350 | 2005-09-29 | Contamination inside the dike has been removed. The dike is being removed and replaced simultaneously. The well is shut in at this time due to a pump break. Case pends. | 9-3-04(A) | |||
820105350 | 2005-09-29 | Contamination inside the dike has been removed. The dike is being removed and replaced simultaneously. The well is shut in at this time due to a pump break. Case pends. | 9-3-05(A)6 | |||
824035996 | 2005-06-21 | The last inspection was 04/06/2005. | ||||
864895762 | 2013-06-11 | I responded to a call from landowner, Robert Bush, about a white tanker truck on location. My inspection found approximately 5" of rainwater inside the concrete dike. I spoke with ODNR Inspector Steve Ochs and found D & L was using Liquid Loggers to pump out the rain water. | ||||
90777642 | 2002-09-03 | The pump house dike inside the building is full to overflowing. The dike outside the pump house has brine in it. Brine is outside the pump house dike and has traveled to the lease road approximately 200' to the southwest. The unloading pad vault is full a | ||||
945026884 | 2010-04-23 | CHECK UIC FACILITY | ||||
949892276 | 2009-04-06 | check uic facility . | ||||
954667031 | 2006-10-23 | check uic facility . | ||||
963468742 | 2003-07-16 | Monitored contamination removal and replacement material delivery. Case pends. | 9-3-04(A) | |||
iTOMK000086 | 2000-11-09 | ANNUAL REPORTS | 9-3-07(E) | |||
iTOMK000124 | 2001-03-01 | 22(C) | ||||
iTOMK000124 | 2001-03-01 | 9-3-04(A) | ||||
iTOMK000124 | 2001-03-01 | 9-3-05(A)6 | ||||
UIC1708 | 1997-11-13 | 1501: 9-3-06 (H) IDENTIFICATION | ||||
UIC1782 | 1999-06-22 | 1501: 9-03-07 (E) (F) ANNUAL REPORTS |