X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-105-22461

Well Details

Well ID: 34-105-22461
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1982-06-12
Unconventional:
Horizontal:
Producing: No
Violations: 13
Latitude: 39.1603861593
Longitude: -81.8412502204

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1018170063 2005-07-28 There were no violations at the time of inspection.
-1116407205 2012-10-10 FOLLOW UP TO NOV # 1350659426 Injection tubing is full of fluid. Unloading pad drain has soil with vegetation growing out of the grate. Both dikes have water in them (6-12 inches). Brine hauling log on site shows only one small load hauled on 9-21-12 from tank compressor 1000 gallon tank. Load was put into # 2 tank. Called John Kent and we discussed the need to keep water out of the dikes. We also discussed the well's condition and the fact that they are not injecting water at this time. John told me that they are planning an acid treatment to help open up the formation. They are hauling their production water to Athens injection well.
-1175157537 2012-07-23 Zero pressure on injection tubing. Last recorded brine transport in log book dated 12-14-11. 1000 gallons from compressor yard. Last recorded company annulus test (monthly test) on 6-4-12.
-1222998948 2014-08-19 Unable to test the annular space because the gauge was rounded off and I was unable to remove it. 9-3-05(B)4
-1329598600 2013-05-06 FOLLOW UP TO NOV # 1350659426. There was not a significant amount of water in the dike (raining at time of inspection), the drain on the offloading pad had been cleaned out and was functioning, the manifest at the well states the last time of drop off was 5/1/13 and the well was tested by the company.
-1374084100 2012-02-17 Follow up to a verbal compliance notice originally issued 2/14/12 by Jon Scott for water in the dikes at the injection facility. Upon inspection there was roughly a foot of water in both of the containment dikes. Dikes shall be kept empty of all fluids. 9-9-05(A)9
-1381618046 2014-06-18 Inspected the containment dikes, tanks, unloading pad, injection pressure and annulus pressure. Identification posted at well. Well is connected for injection. The containment dike with the two 100 barrel steel tanks has approximately 10 inches of water in it. I called John Kent and left a message about the water in the dike and that he needs to remove it and keep the dike free of fluids.
-1412153767 2012-12-11 Acid job. Josh Garland MRI 2 was on site. I stopped by to check on the progress. Unable to pump through tubing. Acid started to cause leaks on the pump truck. Operation was shut down. I discussed with Tom Stone the need to clean out the well prior to another acid job.
-1507873521 2003-12-04 No violations at the time of inspection.
-1638893080 2011-03-30 No violations at this time.
-1643148761 2004-08-17 There were no violations at the time of inspection.
-1655422871 2010-12-16 Good identification. Dikes looked good.
-1690649312 2005-10-20 FAILURE TO SUBMIT ANNUAL SALTWATER INJECTION WELL REPORTS FOR 2003 AND 2004 9-3-07(E)
-1700705447 2010-06-21 Water in dike with 3- 6000 gal tanks. Needs pumped out. Leaking 100 bbl tank, also dike liner with 2- 100 bbl tanks has a cut and assorted small holes in the liner. I called and talked to Tom Stone about these issues and he told me that John Kent will be calling me to discuss the violations and to come up with a plan to correct the problems. 100 bbl tank needs to be replaced. New dike liner installed. 9-3-04(A)
-1700705447 2010-06-21 Water in dike with 3- 6000 gal tanks. Needs pumped out. Leaking 100 bbl tank, also dike liner with 2- 100 bbl tanks has a cut and assorted small holes in the liner. I called and talked to Tom Stone about these issues and he told me that John Kent will be calling me to discuss the violations and to come up with a plan to correct the problems. 100 bbl tank needs to be replaced. New dike liner installed. 9-3-08(A)
-1700705447 2010-06-21 Water in dike with 3- 6000 gal tanks. Needs pumped out. Leaking 100 bbl tank, also dike liner with 2- 100 bbl tanks has a cut and assorted small holes in the liner. I called and talked to Tom Stone about these issues and he told me that John Kent will be calling me to discuss the violations and to come up with a plan to correct the problems. 100 bbl tank needs to be replaced. New dike liner installed. 9-3-08(B)
-1769705098 2009-03-11 No violations were found.
-1797620057 2013-11-21 Inspected the unloading pad, containment dikes, tanks, injection pressure and annulus pressure. Injection tubing has a valve that is closed. The injection tubing is not connected to injection line due to a well stimulation on 11-15-13. The landowner Mr. Craft told me that acid was spilled on the location during the well stimulation on 11-15-13. Lime powder was observed in multiple locations. Mr. Craft told me that most of the acid went into the dike and was removed with a vacuum truck. I called John Kent and asked about the release. John said that he did not know about it and would ask the field staff about the details. I requested to know the quantity and type of acid that was released and what was done to remediate the site after the release. Both dikes are free of fluids.
-193252665 2008-12-03 No violations were found.
-2035767506 2009-11-06 Good identification. The injection operation was not in use at the time of inspection.
-237514194 2011-12-13 Accompanied by Josh Garland MRI. No violations observed during inspection.
-359669366 2011-05-26 Accompanied J. Scott on complaint of brine dumping. Roughly 10 pine trees had been killed/stressed by the spill. Owner states it was accidental.
-363853365 2013-08-07 Installed new Halliburton R-4 packer with used 2 3/8" 10 round tubing. Circulated 40 barrels fresh water through tubing prior to setting packer. (last 20 barrels fresh water had 2 gallons inhibitor ) Set packer at 1305.40 feet. Pulled 13,000 lbs tension. Tested the annulus at 415 psi for 15 minutes. At 5 minutes 415 psi. at 15 minutes 408 psi. Test passed.
-48034223 2007-02-21 All conditions were acceptable.
-747978198 2004-02-05 No violations at the time of inspection.
-802416146 2003-08-21 No violations at the time of inspection.
-871236474 2012-03-02 The pits are being emptied.
-916899097 2002-02-20
-953659101 2005-01-12 There were no violations at the time of inspection.
-955938628 2014-02-25 No noted violations.
-996915144 2012-02-14 Dikes are full of water with an ice layer on top. I called John Kent and told him to remove the water from the dikes. He said that he will have someone do it no later than the 2-15-12.
1000205479 2010-09-14 Received call at 11:21 am from Tom Stone Re: Dike construction for two 100 bbl tanks. Tom told me that the dike dimensions are 42' by 28' by 4' with the tanks sitting on an mound of dirt in middle of dike. Liner will be over the mound of dirt. They will place sand under the liner and on top of liner.
1042410009 2012-11-29 Follow up to inspection 1354126946. The contaminated soils have been removed. The remaining soil was field tested for pH and my test strips read between 6 and 7.
1124911254 2004-03-09 No violations at the time of inspection.
1138651007 2006-01-18 No violations at this time.
1153166584 2006-06-22 There were no violations at the time of inspection.
1165081060 2004-07-15 No violations.
1184353497 2013-05-13 Checked injection pressure and annulus pressure. Containment dikes have 4" of water in the low areas of the dike. (recent rain event) I called and talked to John Kent about the dike water and the need to extend the unloading pad so that their truck will fit on it. John told me that they are scheduling a service rig to pull and replace the tubing and packer.
1216370383 2013-08-06 Francis Brothers service rig on well. Released packer and pulled packer and tubing out of the well. Shut in well head. All valves are closed.
1251299827 2007-04-12 There were no violations at the time of inspection.
1252004373 2009-08-27 Zero pressure on injection. 100psi on annulus. 3storage tanks 6000 gallons each are located in a dike. They appear to be for storage and possible filtering. The dike liner is torn and damaged in multiple areas. 2 100bbl tanks are also located on site in a different dike. This dike liner appears intact. I called Adam Schoppe and discussed the violations and he is going to arrange the necessary work in the field. I told Adam that the liner needs to be 30 mil with 4" sand under and 4"washed gravel over the liner. I also mentioned that they need to check the dike capacity and make sure that it will hold the correct amount. 9-3-08(A)
1262709163 2009-10-13 Received a call from Adam Schope (Mountaineer) Re: What is the minimum thickness for the liner. I told Adam a 30 mil liner needs to be installed. Adam will call me when they get ready to replace the liner.
1271072997 2010-03-17 Dike has water in dike with the three 6000 gallon tanks. The dike with the two 100 bbl tanks has some small holes in side of dike liner from deer walking over the dike. I have called Adam Schoppe and have given him an verbal NOV for the water in dike needing to be removed and that they need to repair or replace the 100 bbl dike liner. I called Adam on 3-18-10 at 10:24 am. Pictures were taken. Well has good id. Well is connected for disposal.
1284500155 2010-09-10 Received call from Tom Stone Re: Tanks will be delivered Monday. Plan to install pit liner on Tuesday 9-14-10. I reminded Tom and John Kent that the dike must be able to hold 110% of tank capacity.
1300926899 2014-05-20 No noted violation.
1330871870 2008-09-10 There were no violations at the time of inspection.
1347600437 2013-10-25 Follow up to -1297660666. The fitting on the injection tubing have not yet been installed to allow for mechanical integrity testing.
1350659426 2012-10-10 Injection tubing is full of fluid. Unloading pad drain has soil with vegetation growing out of the grate. Both dikes have water in them (6-12 inches). Brine hauling log on site shows only one small load hauled on 9-21-12 from tank compressor 1000 gallon tank. Load was put into # 2 tank. Called John Kent and we discussed the need to keep water out of the dikes. We also discussed the well's condition and the fact that they are not injecting water at this time. John told me that they are planning an acid treatment to help open up the formation. They are hauling their production water to Athens injection well. 9-9-05(A)9
1354126946 2012-11-28 Witnessing an acid job. Three Barrels of a 28% Iron Acid -20M was mixed in the tubs with 6 Barrels of fresh water for the acid treatment. The diluted acid mixture was allow to sit in the mix tub too long and corroded through the welds on the tubs. The mixture then mixed with the limestone along the lease road creating a caustic foam that impacted the area. Roughly 480 square feet of limestone lined lease road was impacted under the truck and roughly 40 square feet of soil was impacted near the well head. The acid ran along a ditch roughly 45 feet before encountering a culvert. The acid does not appear to have traveled through the culvert. Contaminated soils and gravel shall be removed and disposed of properly. If a significant amount of impacted soil is removed topsoil shall be replaced to restore the surface to its original grade. Impacted are shall be seeded and mulched and steps shall be taken to encourage vegetative cover. 9-1-07
1354287102 2012-11-30 Follow up to inspection 1354126946. The limestone gravel has been replaced. The contaminated soil has been replaced and fresh top soil has been laid down. The area has been seeded and mulched in order to encourage vegetative cover. Landscaping mesh has been laid down over the mulch to ensure the mulch remains on site. The culvert has been cleaned out. The soil in the lease road was field tested for acidity and it registered a pH of 7. Pictures of the reclamation taken. The UIC numbers and log of a Viking Well Services Brine truck on site were also verified.
1354290366 2012-11-29 I called and talked to John Kent Re: what is their plan for getting the well capable for injection. John told me that they are rescheduling the acid stimulation for the 1st week of December 2012.
1355248202 2012-12-11 Company attempted an acid treatment on well. Three Barrels of 28% Iron Acid were pumped into tubing but were never displaced into formation. Pressure was raised to 300 psi multiple times but the acid never left the tubing. The tubing will be swabbed clean and acid will be stored in a plastic tank for future use. The annular pressure was monitored during the treatment and there was no sign of communication. During the treatment the annular space had no pressure on it while the injection tubing had 300 psi.
1359490911 2013-01-29 There is still roughly 1-1.5 feet of water in the dike. The drain on the offloading pad is still plugged and full of water.
1365788127 2013-04-12 Inspected the containment dikes, tanks, unloading pad, injection pressure and annulus pressure. Identification at wellhead.
1377085894 2013-08-15 Injection line is disconnected from the injection tubing. John Kent is scheduling an acid stimulation prior to placing well back into service. Both containment dikes have 5" of water in them from the last rain event.
1385559389 2013-11-22 Talked to Tom Stone about the acid job on 11-15-13. Tom said that they spilled 1.5 gallons of acid and cleaned it up and applied lime to the site. I asked for a job report from the service company. Tom said that he will ask John Kent to send one to me.
1398681394 2004-04-08 No violations at the time of inspection.
1406885551 2010-09-27 Replaced two 100 bbl steel tanks and rebuilt dike with new 30 mil liner. Tanks are plumbed and in operation.
1471281353 2006-04-04 There were no violations at the time of inspection.
1537757963 2008-04-21 There were no violations at the time.
1646434182 2013-07-10 The vault in the unloading pad was functioning correctly. Tanks are being painted. The last load at the facility was delivered about 6 months ago according to the manifest at the well.
1667580863 2006-12-18 There were no violations at the time of inspection.
1777673751 2004-10-07 There were no violations at the time of inspection.
1783058637 2006-10-17 There were no violations. Accompanied by Jon Scott.
1783493449 2005-06-23 There were no violations at the time of inspection.
1812297949 2003-05-20 Follow-up on NOV, In-Compliance, met company at well site.
1859388636 2005-10-14 There were no violations at the time.
1875603861 2007-06-04 No violations were found.
1936518435 2010-08-31 2 100 bbl steel tanks have been drained. New 30 mil liner has come in. Company is waiting on 2 new 100bbl steel tanks to arrive before starting the project. The second dike with 3-6000 gallon tanks has been pumped down 12", dike still has between 1" and 3" of water in low areas of dike.
194209111 2008-06-10 No violations were found at the time of inspection.
1963958168 2009-05-06 No violations were found at the time.
20041082 2007-07-17 No violations were found at the time of inspection.
2010419901 2006-06-06 There were no violations at the time of inspection.
2038694724 2010-06-24 Talked to Tom Stone Re: leaking 100 bbl tank and replacing dike. Along with pumping out the fresh water in 3-6000 gal. tank dike. Tom said that they are going to replace both 100 bbl tanks and will look into replacing the dike liner at the same time. Tom told me that he has both 100 bbl tanks emptied.
2082190644 2012-07-23 Talked to John Kent and Tom Stone about the injection well status. They told me that they are planning an acid job soon.
399321842 2006-08-16 No violations were found.
427392225 2003-03-05 FOLLOW UP TO NOV # 737973241 An inspection of the well revealed there is no fittings on the Injection side or the Annulus side of well to check pressures. NEED 1/4" FIITINGS ON WELL, UNABLE TO CHECK PRESSURES ON WELL. 9-3-05(A)3
427392225 2003-03-05 FOLLOW UP TO NOV # 737973241 An inspection of the well revealed there is no fittings on the Injection side or the Annulus side of well to check pressures. NEED 1/4" FIITINGS ON WELL, UNABLE TO CHECK PRESSURES ON WELL. 9-3-07(E)
506861824 2009-11-05 Reconstruction of dike. Dike measures 21' by 46' by 2'. Submitted dike plan to Tom Tomastik for approval.
514524137 2013-01-24 Dikes are free of water. Some work has been done to the fence near the well and the identification is on the ground. Inspected the injection tubing pressure and the annulus pressure.
656929786 2009-06-09 There were no violations at the time of inspection.
667869530 2011-08-24 Water in dikes. Called Tom Stone, he said that he will take care of the water.
704144641 2009-11-06 Reconstruction of dike and liner. Install 30 mil liner in dike with 3-6000 gallon tanks. 6" of sand was placed below the liner and 6" of sand was placed on top of the liner.
724406249 2005-05-10 There were no violations. However, additional tanks on site appear to have an inadequate dike capacity.
737973241 2003-03-05 An inspection of the well revealed there is no fittings on the Injection side or the Annulus side of well to check pressures. NEED 1/4" FIITINGS ON WELL, UNABLE TO CHECK PRESSURES ON WELL. 9-3-05(A)3
737973241 2003-03-05 An inspection of the well revealed there is no fittings on the Injection side or the Annulus side of well to check pressures. NEED 1/4" FIITINGS ON WELL, UNABLE TO CHECK PRESSURES ON WELL. 9-3-07(E)
739669403 2011-09-27 Fresh water in dikes from recent rain event.
742004490 2009-11-24 Three 6,000 gallon tanks are in the new dike and are connected to injection equipment. The second dike liner has not been patched. Damage appears to be from deer in the dike.
746814585 2008-03-10 There were no violations at the time of inspection.
76793142 2011-12-15 Accompanied J. Scott on SWIW inspection. Dike has roughly 6 inches of water in bottom of it. No other violations. Well on vacuum.
778986041 2004-05-03 Unable to access 1/4 inch female fitting on the tubing, because the plug started to round-off.
861642675 2013-10-30 Follow up to -1297660666. The injection tubing was equipped with a fitting to monitor mechanical integrity.
PL11123 Preliminary Restoration done information from Data Point