{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.5628955179,"lon":-81.5068563625,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-09-30 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 39.5628955179 | |
Longitude: -81.5068563625 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1223178609 | 2013-11-05 | Total depth at the time of inspection was 5215. A survey tool had been lost in the hole. Rig crews were getting ready to retrieve it. Spoke with Mr. Larry Howell. | ||||
-125085316 | 2014-03-27 | Checked on the status of flowback operations. There are numerous 500 barrel frac tanks on site. Spoke with contractor on site. There is no pollution or contamination on site. Well is equipped with tubing and a rabbit catcher. | ||||
-1879335965 | 2013-10-25 | Received phone call from Mr. Dave Grey. He stated that they will be spudding in 24 hrs. on this well. | ||||
-508416569 | 2014-01-06 | I was notified by Mr. Tony Long by e-mail that there had been a small oil-based mud spill on the Garvin Pad during the process of moving the rig off of the location. He had also sent me pictures. There was less than 5 gal and it was contained within the pad. When I observed the site, everything had been cleaned up and no evidence of the oil-based drilling mud was left. | ||||
-741902883 | 2013-10-30 | Total depth at the time of inspection was 1292 ft. Hole was nudged out with an azimuth of of 168.37 degrees and an inclination of 3.96 degrees. I was accompanied by Inspector Mike Mitchell. | ||||
1387574243 | 2013-12-20 | Total depth of the well at the time of inspection was 15,531 ft. The hole was being conditioned and crew was getting ready to run 5.5 in casing. Spoke with company man on site. | ||||
1624903103 | 2014-07-14 | Upon inspection, it was observed that a vegetative cover has been established throughout the limits of disturbance for this pad location. Any and all drilling equipment has been removed from the location, and any and all pits used for drilling activities have been filled. This satisfies the requirements for the preliminary restoration. Accompanied on this inspection by DOGRM Engineer Jason Simmerman, and DOGRM Engineering Technicians Andy Thomas and Anthony Carson. | ||||
1796318649 | 2013-11-04 | Picked up paperwork from 13.375 in casing cement job. The total depth was 4497 ft. of 12.25 in hole. Spoke with Mr. Larry Howell on site. | ||||
1931016102 | 2013-12-09 | Total depth at the time of inspection was 7051 ft. The azimuth was 250.54 degrees. 6853 was the kick-off point. They are building curve at this time. Spoke with company man on site. | ||||
505758010 | 2014-01-28 | I inspected site to check on the status of the stimulation operation in progress. They had finished up the 8th stage. Frigid temperatures were making it hard to move water. It was being trucked in. Spoke with Mr. Cliff Anderson on site. | ||||
654858472 | 2013-10-27 | Witnessed the cementing of the surface casing. 450 ft. of 24 in. hole was drilled and 430 ft. of 20" casing was ran. I tested the mix water to be used for the cement. It showed no chlorides. Cementing company had trouble getting the cement head to seal. The decision was made to weld the head to the casing. Good circulation and good returns were observed at the surface. |