X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-21108

Well Details

Well ID: 34-067-21108
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-05-12
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 40.4177658951
Longitude: -81.0522997992

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1369054607 2013-05-13 I arrived on location for the cementing of the conductor pipe. 120' of 20 cemented with 240 sacks. No violations this date.
1375159415 2013-07-30 I am on site tonight to witness the running and the cementing of the 13-3/8" inch diameter casing. Nomac Drilling Rig # 71 drilled a 17-1/2" inch diameter hole to 620 ft and set 610 ft of casing. Schlumberger Cementing Service c/w 553 sks had loads of cmenet back.
1375894148 2013-08-07 I am on site today to check on the drilling status of Nomac Drilling Rig # 71 they are at 7305 ft and building the curve section of the hole.
1432950470 2013-10-03 On the day of my inspection the site passed preliminary restoration according to 1509.072A.
268029142 2013-08-15 I arrived today to check Nomac Drilling Rig # 71 and found that they are moving today to the # Long 6H and should be ready to spud tonight and set surface Friday. I was also on site to collect cement information but while checking I discovered that the reports all had -0- in all of the boxes. I was advised that they would request the corrected information and send me a copy.
48443480 2013-08-16 I am on site today to witness the running and the cementing of the surface casing for the # 6 H well. While on site I received the cement information for the 5-1/2" inch diameter production casing which was blank when I checked my ticket. I will also fill out a Cement Ticket to update all information. Nomac Drilling Rig # 71 drilled a 9-5/8" hole to 15,451 ft. and set 15,451 ft of casing. Schlumberger Cementing Service c/w 870 sks of lead @13.5 lb with a yield of 1.67 and 1852 sks of tail cement @ 15 lb with a 1.3 yield. Set date was 08/14/2013 they indicated 4 barrels of cement returns.