If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24238 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.7499413167,"lon":-81.1117508641,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2009-06-29 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 39.7499413167 | |
Longitude: -81.1117508641 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1104582927 | 2010-10-12 | FOLLOW UP TO NOV # -692404945 On day of inspection well is supplied with pump jack and 7cas,4.5cas,1.5tubing.There is a 100bbl tank in a shared tank farm down on wolf pin rd.There is no id or dike. I called and met with Bud Byers and is moving in another tank battery. He will then dike and id .There is 90%vegetation at the well site. Preliminary restoration did not pass the day of inspection. I will stop at later date. | ||||
-692404945 | 2010-10-12 | On day of inspection well is supplied with pump jack and 7cas,4.5cas,1.5tubing.There is a 100bbl tank in a shared tank farm down on wolf pin rd.There is no id or dike. I called and met with Bud Byers and is moving in another tank battery. He will then dike and id .There is 90%vegetation at the well site. Preliminary restoration did not pass the day of inspection. I will stop at later date. | ||||
-83215832 | 2010-10-12 | FOLLOW UP TO NOV # -1104582927 FOLLOW UP TO NOV # -692404945 On day of inspection well is supplied with pump jack and 7cas,4.5cas,1.5tubing.There is a 100bbl tank in a shared tank farm down on wolf pin rd.There is no id or dike. I called and met with Bud Byers and is moving in another tank battery. He will then dike and id .There is 90%vegetation at the well site. Preliminary restoration did not pass the day of inspection. I will stop at later date. | ||||
1998573666 | 2010-10-12 | FOLLOW UP TO NOV # -692404945 On day of inspection well is supplied with pump jack and 7cas,4.5cas,1.5tubing.There is a 100bbl tank in a shared tank farm down on wolf pin rd.There is no id or dike. I called and met with Bud Byers and is moving in another tank battery. He will then dike and id .There is 90%vegetation at the well site. Preliminary restoration did not pass the day of inspection. I will stop at later date. |