34-029-21718

Well Details

Well ID: 34-029-21718
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2012-08-10
Unconventional:
Horizontal:
Producing:
Violations: 0
Latitude: 40.8211784988
Longitude: -80.6091374345

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1222576869 2012-08-27
-1634827163 2012-08-20
-1962343442 2012-11-27 I was at the site for as status check. The well had been hydraulically fractured. There was a frac valve on the wellhead, but no other equipment. All that remained was a roll-off and some porta-johns.
-350611340 2012-08-11
-489493311 2012-11-06 I stopped at the site for a status check. There was no activity at site, and the gate and fence entry were locked.
-840188641 2012-08-10
-859744320 2012-09-01
-901774398 2012-08-22 I was at the site to witness the plug back operation. Following completion of the pilot hole and subsequent testing, Halliburton was on site to plug back the well, and set a kick off plug. Three plugs were set. Details of the plugging operation can be found in the Casing Ticket, and the Plugging Report.
1346761656 2012-08-13 ON 8/13/20912, I was on location to meet Tim Allen Drilling Foreman on Patterson Rig 154.They were preparing to log the well bore before running there 9.625 intermediate casing. I arrived on location at 7:00 pm they ran 1577' 40 # 9.625 intermediate casing. Halliburton on location to cement the casing good circulation and good cement returns.
1385576936 2012-08-02 While in the area for a cement job at another location, I stopped by to check on the move-in progress of the drilling rig. I found that preparations were underway, but no rig equipment was on site. Mat boards were being laid down, and secondary containment was staged.
1604158679 2013-10-01
1852743113 2012-08-07 I went to the site and had a pre-spud meeting with drilling consultant Tim Allen. Mr. Allen indicated that if set-up operations continued well, they hoped to spud the surface hole within the next two to three days.
276058710 2012-08-09 I went to the site to check on the drilling status. Rig personnel indicated that they hoped to spud later in the day.