If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23120 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.0193026673,"lon":-81.561672763,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2010-11-17 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 41.0193026673 | |
Longitude: -81.561672763 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1011123396 | 2010-11-23 | Union Drilling Rig 24 is drilling ahead on salt water. No violations at this time. | ||||
-1124359250 | 2010-11-17 | Union Drilling Rig 24 is nearly rigged up over the well. They should be ready to spud sometime tomorrow. | ||||
-1325914645 | 2010-12-29 | Completed the mechanical integrity test on the 7" casing cemented in this well on 11/30. The test began at 09:00 am with an initial pressure of 565 psi. After 15 minutes, the pressure remained at 565 psi. The MIT passed. Cargill will notify MRM when the cement bond logs are scheduled for the Akron 76 and 77 wells. | ||||
-133943894 | 2011-10-24 | Preliminary Restoration is approved. | ||||
1292250354 | 2010-11-26 | Union Drilling Rig 24 is drilling ahead with saltwater. No violations at this time. | ||||
1915525590 | 2013-06-24 | The well was properly identified. My inspection was accompanied by Andrew Adgate. | ||||
418861707 | 2010-11-28 | Union Rig 24 is drilling ahead with saltwater. Should TD the well in the next 24 hours. No violations at this time. |