If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23056 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.3146868424,"lon":-81.4599404045,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2008-10-03 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 41.3146868424 | |
Longitude: -81.4599404045 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-18775025 | 2008-10-02 | The pits have been dug and the rig should arrive within the next few days. No violations at this time. | ||||
-254662943 | 2008-11-25 | The well has been completed and the required fencing has been installed around the well and the tank battery. The well can be turned on any time. Preliminary restoration will probably not be completed until spring of 2009. | ||||
-821401250 | 2008-09-23 | Mid-West land clearing was on site cutting and chipping trees. The drilling rig is scheduled to arrive next week. | ||||
-959999725 | 2008-10-06 | I witnessed the cementing of the 8 5/8" casing. There were no violations at this time. | ||||
1223410330 | 2008-10-06 | I performed a rig inspection. The drilling pits and pit liners were in good shape. The location was in good shape. There were no violations at this time. | ||||
1227045062 | 2008-11-12 | The board-on-board fence around the wellhead and the tank battery is being built. The well will be turned on as soon as the meter run and tie in are completed. The pits have been solidified and the site has been rough graded. No violaitons at this time. | ||||
1720188642 | 2009-01-13 | The well is in production with the required fencing and identification in place. Preliminary restoration status will be determined as weather permits. | ||||
257186299 | 2009-12-03 | Preliminary restoration is approved. | ||||
82109020 | 2008-10-17 | The pits have been solidified and are being closed. The dust was delivered by Chemtech and mixed by Cutter. | ||||
831552656 | 2009-06-18 | Preliminary restoration will be approved as soon as a topsoil stockpile is removed or graded and seeded and a mulch pile is removed or used. The well is in production and the required fencing and ID are in place. |