If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23080 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.9455652001,"lon":-81.6398029434,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2009-07-06 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.9455652001 | |
Longitude: -81.6398029434 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1247509680 | 2009-07-06 | Whipstock Drilling Rig 23 will spud the well later today. The pits are being dug and will be lined prior to spudding the well. | ||||
1248401050 | 2009-07-13 | Whipstock Rig 23 has resumed drilling and should TD the well by the end of the week. The pits are lined, fenced and in good condition. | ||||
1248707620 | 2009-07-15 | Whipstock Drilling Rig 23 is running 4-1/2" production casing. The drilling pits are lined, fenced and in good condition. The rig is scheduled to start moving to the Miller 3 (permit 169-5633) on 7/16. No violations at this time. | ||||
1250088495 | 2009-08-05 | Bishop Well Service is on site for the well completion. The affected area has been rough graded and will need to be finished, seeded and mulched for preliminary restoration. | ||||
1406389946 | 2009-07-21 | ChemTech and Daily Excavating were on site to solidify the drilling pits. | ||||
1446960987 | 2009-07-29 | Hawk Pipeline was building the tank battery and Bishop Well Service was on the well. No violations at this time. | ||||
1746653548 | 2010-04-20 | Preliminary restoration is approved. | ||||
1805708274 | 2009-07-08 | Whipstock is down for repairs. The needed parts are scheduled to arrive tomorrow morning. The pits are fenced, lined and in good condition. No violations at this time. | ||||
439117699 | 2009-06-30 | Whipstock Rig 23 has moved on location and is rigging up. They will not dig the drilling pits or spud the well until July 6. | ||||
580244118 | 2009-06-23 | Bennetts Excavating is on site building the drilling location. Whipstock is scheduled to arrive on or about July 6 to start drilling. The permit and identification are posted as required. |