34-127-23154

Well Details

Well ID: 34-127-23154
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1972-05-11
Unconventional:
Horizontal:
Producing: No
Violations: 3
Latitude: 39.6820668654
Longitude: -82.2513375994

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-135180267 2013-03-05 Make well capable of commercial production within 60 days; or plugging is required within 90 days.

Failure to comply may result in Forfeiture of Bond.

9-9-05(A)10
-135180267 2013-03-05 Make well capable of commercial production within 60 days; or plugging is required within 90 days.

Failure to comply may result in Forfeiture of Bond.

NONE
-135180267 2013-03-05 Make well capable of commercial production within 60 days; or plugging is required within 90 days.

Failure to comply may result in Forfeiture of Bond.

NONE_
-1752692522 2013-08-29 Mark called me to let me know that he is working on trying to put this well back in production before he decides to plug it. He said he was not around at the time when this well was shut down. He wants to find out why and if they can get it going again. He will know something within the next month.
-842550963 2014-01-14 I had to stop by Jeanie Enterprises to get the clay tickets for the plug job on this well. They made me a copy of them.
1045092224 2013-12-10 This well has been plugged. The rig crew has moved there rig off of the location. The clay is at the surface. The well will be left open for a couple of weeks to see if the clay settles at all. I met with Keith Matheney to get the affidavit off of him for this well.
1162922234 2013-11-29 The rig crew had Appalachian come in to shoot the 4" off. They shot it off at 2510ft. They then pulled out 110ft of 4" before they washed in the Lime plug. They washed in 500ft of clay.
1384797574 2013-11-15 Keith Matheney has his rig on this well to plug it. I met them at the well to see what they are planning on doing. The clay is bridged at 1882. They are trying to find some 3" tools to beat on the bridge. They will call me if they work on the well today.
1385125053 2013-11-20 Keith Matheney and rig crew were on location to run 2" tubing in hole with a drill bit on bottom. They were having trouble getting down hole. They got the tubing down to were the bridge was and shut down until the next day.
1385933282 2013-11-25 The rig crew was on location to work on plugging this well. They pulled the tubing back out of the well and tagged the clay to see how much was left in the hole. They washed in another 300ft of clay and tagged the plug again. The clay was up to 2640ft. The rig crew shut down for the day to set up someone to shoot the 4" off.
1403612508 2014-06-23 The final restoration meets 1509.072.
1769753614 2013-11-26 The job was canceled to shoot off the 4" do to the weather. It is rescheduled for the November 29th at 8am.
2040928754 2013-11-18 I showed up to the rig. There was no one on location. I contacted Keith Maheney and he said they would not be onsite today. They are working on getting a bit and rounding up some tubing to drill out the bridge.
374235680 2013-10-17 I stopped at Jeanie Enterprises to see what they are planning on doing with this well. There was no one at the office when I arrived. I tried to call Mark Schmeltzer and left him a message. I then waited a few minutes and Tim Schmeltzer arrived at the office. I talked with him about this well and he informed me that it is on the plug list. They do plan on plugging this well soon.
4095122 2013-11-21 The rig crew bridge the well off at 1882 with plugging clay on this well so we had Cemenco LLC onsite to wash the clay out and drill through the bridge. When we first started pumping through the tubing the bit plugged up so the rig crew started pulling out the tubing. We got 22 joints out and it cleaned up. When then started cleaning up the hole and pumping out the clay until we made it down through the plug. We ran the rest of the tubing in to make sure the hole was clean.
806974962 2013-10-09 I tried to contact Mark about this well. The last time I talked to him he was trying to get the approval on putting it back in production. I left him a message to call me about it but have not received a call back yet at this time.
880909532 2014-05-27 I returned to this well to do a final restoration. The well does not meet the requirements of 1509.072. I have contacted Tim Schmeltzer and let him know that the plastic line needs removed along with the 100 barrel tank that is still there. I will check on this well at a later date.