If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24243 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.9511924851,"lon":-81.4345574728,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-01-18 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 39.9511924851 | |
Longitude: -81.4345574728 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1952760858 | 2013-01-15 | Conductor rig(Express Energy) preparing to move in on site and set &cement pipe in place. | ||||
-2128542914 | 2013-04-15 | On the day of my inspection I witnessed the rig drilling at twenty foot an hour at a depth of 4600'. | ||||
1357999766 | 2013-01-09 | Inspection revealed that site has been built and company rep stated that conductor rig will arrive next week to drill&set conductor casing and also set mouse hole casing. | ||||
1365256703 | 2013-04-06 | My inspection today finds the rig drilled 380' of 24" hole. The rig ran 345' (kb) of 20" 94# casing. Universal cemented the casing in place with 120 bbl of type 1 cement with 3% CaCl. Approximately 40 bbl of returns to surface. The cement was displaced with 123 bbl of water. | ||||
1780844672 | 2014-01-28 | The site passed preliminary restoration according to 1509.072A. |