If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-151-25673 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.7861330521,"lon":-81.5130489062,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2010-05-22 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.7861330521 | |
Longitude: -81.5130489062 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1091674764 | 2010-05-04 | Jay Cheslock received a complaint call from Lucille Parker (330-832-1937) on 5-4-2010 regarding activity at the new drilling location near her home at 929 3rd St. SE in Massillon, OH. I inspected the site and met with John Rose, who was building the access road and pushing topsoil. I also met with Lucille Parker and discussed the future drilling activities at the site. | ||||
-1526207800 | 2010-03-23 | I met with Dale Nething (Ohio Valley Energy) and John Howell (Wildcat Drilling) to discuss the future location of the drilling pits. This well will be drilled before July 2010. | ||||
1274728736 | 2010-05-22 | Wildcat Drilling is moving onto the location and will spud the well tonight. I met with John Howell and discussed the urban drilling requirements. | ||||
1275072788 | 2010-05-26 | Dusting at 4470'. Drilling pits and liners are intact. | ||||
1275412521 | 2010-05-29 | The Rose Run was dry. Petroset pumped the Rose Run, Trenton, and thief plugs thru drill pipe. The well was plugged back to the Clinton Sandstone. 4-1/2 dia casing was run thru the Clinton Sandstone and cemented. | ||||
1275938009 | 2010-06-03 | The location and the drilling pits are fenced. The drilling pits are 1/2 full. There are 2 - 500 bbl frac tanks on the location. | ||||
1277923044 | 2010-06-29 | The well has been completed. The drilling pits are closed. There is 1 - 300 bbl frac tank on the location. | ||||
1281030277 | 2010-05-28 | Switched over to fluid drilling at 6593'. Reached T.D. of 6869' Will trip out of the hole to log. | ||||
1285462867 | 2010-09-23 | The well is ready to go into production and the reclamation is nearly completed at the site. I called Dale Nething (Ohio Valley) and requested additional seeding at the site. I did not pass the Preliminary Restoration at this time. | ||||
1326809656 | 2012-01-06 | On 1/6/2012, I performed a status check on the above well site. The well is in production, the site is reclaimed and identification signs are posted. The Preliminary Restorstion is PASSED. | ||||
1526301345 | 2010-05-23 | Petroset cemented 11-3/4 dia conductor casing. The drilling pits are fenced off and the pit liners are intact. | ||||
1594307993 | 2010-07-13 | The tank battery is set and the location is graded but not seeded. | ||||
177230565 | 2010-06-08 | The drilling pits are being solidified today. | ||||
1819843662 | 2010-05-24 | Universal cemented 8-5/8 dia surface casing. The drilling pits are fenced off and the pit liners are intact. | ||||
2076440435 | 2014-03-24 | During my inspection I found this well to be plugged back from the Rose Run formation to the Clinton Sandstone and is currently a production well, not plugged and abandoned as listed on RBDMS. I found a fenced tank battery with a 100 bbl production tank, 50 bbl poly brine tank and a horizontal separator. The tank battery and well have proper I.D. signs. The well is a plunger lift well that is fenced. The location has vegetation established and landscaping in place. There are no violations at this time. | ||||
298917174 | 2010-06-01 | Wildcat Drilling is rigging down and moving off of the location. |