If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24379 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.9249590912,"lon":-81.2421609624,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-10-17 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 39.9249590912 | |
Longitude: -81.2421609624 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1943109714 | 2012-10-19 | On site to witness the surface string cement job. G & L Drilling ran 1440 of 7" pipe. Cemented to surface. The job was delayed by the cement contractor running late. | ||||
-1983550442 | 2012-10-17 | My inspection today finds G & L Drilling is drilling a 15" hole to set conductor. I am on site to witness the conductor cementing. Rig crew ran 106' of new 9.625" 36# pipe. Formation Cementing could not get circulation. Spotted a 75sk plug out the bottom of the pipe. Filled 30 shovels of cuttings in from surface, then top filled 35sks of cement to surface where the plug stayed. | ||||
1351087308 | 2012-10-24 | My inspection today finds the rig crew has ran 10.5# 4.5" casing to a depth of 4665'. There is a packer set at 2265' with slotted pipe below. Formation Cementing is on site to cement the string in place. Cementers used 120 sks of class A cement 1% gel. | ||||
1885961731 | 2012-10-23 | Stopped at the rig to check the depth. The rig was drilling @ 3880'. |