If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21260 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.2960165962,"lon":-81.1852584083,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-02-21 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.2960165962 | |
Longitude: -81.1852584083 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-202921942 | 2014-02-03 | Maric Drilling was to have moved on to this site today. Due to the -15 degree temps the location was not finished and the rig will move at the end of this week. No rig today. | ||||
-359877079 | 2014-02-11 | Northeast Drilling is still on site and the rig is not drilling. The rig was not scheduled to remain on site because another rig was scheduled to move in and continue drilling the well. | ||||
1334968096 | 2014-02-24 | I am on site tonight to witness the running and the cementing of the 8-5/8" inch diameter casing string. Maric Drilling drilled a 11" inch diameter hole to 1511 ft and set 1485 ft of casing. Petroset Cementing Service c/w 245 sks light and 245 sks class A - 15.6 -1.18- Had 15 bbl of good cement returns. | ||||
1390572993 | 2014-01-22 | Met Ralph Beach on site and went over casing program and drilling schedule. | ||||
1393372905 | 2014-02-24 | I am on site today to check on the drilling status of Maric Drilling. I found that they are drilling an 11"inch diameter hole at 1317 ft and should TD later today. Casing cement job should be ready this evening. | ||||
1576411329 | 2014-03-13 | Drilling equipment has been removed and the pits are pumped down ready to close. |