34-115-21451

Well Details

Well ID: 34-115-21451
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date:
Unconventional:
Horizontal:
Producing: No
Violations: 3
Latitude: 39.6217219647
Longitude: -81.7300149612

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1015967379 2014-01-28 Compliance Action Follow-up -1753839172: Dan Walker called and stated they had not submitted an application for a plug permit and will here this week. Once they get the permit he will secure a rig and plug the well.
-1753839172 2013-10-07 This is an idle well sitting in the dike of well 24628 by same company. Gas is bubbling on the outside of the casing at ground level. The well is also less than 50' from the production tanks. Well tender showed up and stated the well was bad and had junk down the hole. Operator must make well capable of production within 60 days; or plugging is required in 60 days. 9-9-05(A)2
-1753839172 2013-10-07 This is an idle well sitting in the dike of well 24628 by same company. Gas is bubbling on the outside of the casing at ground level. The well is also less than 50' from the production tanks. Well tender showed up and stated the well was bad and had junk down the hole. Operator must make well capable of production within 60 days; or plugging is required in 60 days. NONE
-1753839172 2013-10-07 This is an idle well sitting in the dike of well 24628 by same company. Gas is bubbling on the outside of the casing at ground level. The well is also less than 50' from the production tanks. Well tender showed up and stated the well was bad and had junk down the hole. Operator must make well capable of production within 60 days; or plugging is required in 60 days. NONE_
-97945371 2014-05-01 Compliance Action Follow-up -1753839172: The well is still idle and in the dike.
1199834258 2008-01-08 Stopped by drilling rig for status check,they were rigging up preparing to start in well to deepen well to Clinton/Medina sands they are going to use a 3.875 PDC bit if all works out owner stated their will be many possibilities for other operators to complete wells in this fashion.
1200138390 2008-01-11
1274449361 2014-01-14 Compliance Action Follow-up -1753839172: The well is still sitting idle within the dike. I talked to Dan Walker and he said there was a plug permit but he wasn't sure when they planned on plugging the well. He will let me know a plan once he finds out from Dave Hill.
1486087976 2007-09-04 Stopped by service rig to check on cement job being preformed on well,rig crew was hooking up Universal Well Services to perform squeeze job on Oriskany perfs they are planning on drilling well to Clinton sand with a coil tubing unit in the near future.
427859590 2014-03-14 Dan Walker has sent in a plug permit and it has been approved with the state.