34-111-24484

Well Details

Well ID: 34-111-24484
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2014-06-19
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 39.8328640624
Longitude: -81.3021826017

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1082138374 2014-07-16 My inspection today finds the drilling rig, Patterson 342 is drilling a 8.75" hole at a depth of 9250'.
1403200153 2014-06-19 The said well was spudded on this day by Express Energy with a proposed 100' of 32 conductor borehole to be drilled.
1479145555 2014-07-22 Status check inspection on the drilling process found the current drilling depth to be 14,973' using a 8.5 directional drilling assembly with a current directional azmuth of 146.71 degrees and 3817 units of 3rd party gas present.
1514961832 2014-06-28 I am onsite to witness surface cementing operations. Patterson rig 342 ran 349' of 18.635" casing. Allied Oil and Gas Services circulated 720 sacks of class A cement into place. I witnessed 65 barrels of cement return to surface.
443284723 2014-06-20 The said well was spudded on 06/19/2014 by Express Energy's top hole rig with 100' of 32 conductor borehole being drilled and on 06/20/14 100' of 26 conductor was set and cemented to surface by Express Energy's cement services using 330 sacks of class A cement- 2% calcium-.50 pound per sack flow seal with 10 barrels of cement returns to surface.
803270917 2014-07-09 Status check inspection found Patterson Drilling on the hole and the 12.250 diameter 2nd intermediate well bore has been drilled to a completed total depth of 7,147' and the company is pulling out of the hole with the drill string and preparing to run the 9.625 2nd intermediate casing string.
948612233 2014-07-02 I am onsite to witness the first intermediate casing string cementing operations. Patterson rig 342 ran 2197' of 13.375" J-55 casing. Allied Oil and Gas Services cemented the casing in place with 394 barrels of class A cement. I witnessed good cement returns to surface.