If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-031-25492 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 1985-07-31 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 1 | |
Latitude: 40.2103131467 | |
Longitude: -82.1008574842 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1059545931 | 2007-07-20 | Follow up idle well . Took pictures of well , request chiefs order to plug . | ||||
-1505580159 | 2003-10-23 | Well idle , pumping unit removed from well ( on location not hooked up ). Well has 4 to 2 swedge shut in . Lead line unhooked from well head . Storage tanks has been removed from location . | NONE | |||
-1506185756 | 2009-11-04 | Well not equipped for production . 4.5 casing is all that is at site . There has been a permit to plug issued . | ||||
-1704522547 | 2012-09-04 | On the day of my inspection Berry Well Svc finished topping off the well for a total of 10 tons clay from the pre-cast plug to surface. They cut the casing off 48" below grade, capped the well with a steel plate, and pulled the flow line up. | ||||
-576408576 | 2003-10-23 | FOLLOW UP TO NOV # -1505580159 Well idle , pumping unit removed from well ( on location not hooked up ). Well has 4 to 2 swedge shut in . Lead line unhooked from well head . Storage tanks has been removed from location . | ||||
-593258798 | 2012-10-17 | On the day of my inspection I found that all production equipment was removed from the site. There were no leaks or spills. The soil was graded out to the approximate original contour. Seed and straw was spread over the well site and the lane used to access the well. Grass growth was established and there were no signs of erosion. This site passes final restoration. | ||||
1058122510 | 2012-08-30 | On the day of my inspection I found that Berry Well Svc tagged bottom at 3340'. They shoveled 5 tons of clay in the 4.5" casing, then ripped the casing at 2670'. They pulled up to 2158' and shoveled 5 more tons of clay through the 4.5" casing. | ||||
1128096341 | 2005-09-30 | Follow up idle well , Permit issued in April 04 , expired April 05 . Well still idle , needs plugged . Request chiefs order to plug . | ||||
1175880349 | 2006-07-10 | Well idle , pumping unit removed from well head , unit still on location , no storage tanks , plugging permit issued . | ||||
1248280161 | 2009-07-22 | Call from Dave Hill this date , went over well status and plans to plug well this summer . | ||||
1291055869 | 2010-11-29 | Well site idle, no equipment at site. 4.5 casing shut in. plug permit reissued. | ||||
1325004573 | 2011-12-27 | There is no production equipment at well site. Well is equipped with 4.5 casing and 2" valve that is shut no lead line hooked up at well head. | ||||
1346775932 | 2012-08-31 | On the day of my inspection Berry Well Svc pulled the remaining free 4.5" casing from the well. They set a pre-cast concrete plug at 1022' then shoveled 3 tons of clay into the well. They attempted to pull the 8.625" casing with no success. The rig pulled 65,000 pounds and the casing would not move. They shoveled clay to surface and shut down for the weekend to let the clay settle. |