34-153-23143

Well Details

Well ID: 34-153-23143
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2011-11-17
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 41.0267843047
Longitude: -81.4810312186

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1129580220 2011-11-21 Poulson is drilling on fluid at 3900' and should reach total depth tomorrow morning. They switched from air to fluid drilling at 3550' as required by permit. The pits are fenced, lined and in good condition.
-1206000141 2011-11-16 Poulson Drilling is starting to move on location. They should be ready to spud the well later tonight or tomorrow.
-1268797619 2011-12-01 The drilling pits have been solidified and are being covered over. The well is scheduled to be perforated and fraced next week.
-613994909 2011-11-28 Poulson Drilling has moved off location. The pits have been pumped down and are fenced, lined and in good condition.
1092869450 2011-12-21 The pits have been solidified and backfilled. Everflow will cover this area with asphalt after it has stabilized. The well has been fraced and 1.5" tubing installed.
1321308308 2011-11-04 The location is ready for the drilling rig. The asphalt parking lot will not be cut or disturbed until the rig arrives.
1474388939 2012-07-10 Preliminary Restoration is approved.
739779534 2012-01-18 The flowline is being installed from the wellhead to the existing tank battery for the AFA #4 well. The safety bollards are in place and pits have been solidified and covered. The affected area will be repaved as soon as the weather permits.
932822456 2011-11-17 Poulson spudded this well early this morning and set but did not cement 62' of 11.75" conductor casing. They are currently drilling an 11" surface hole and should be ready to cement casing late tonight. The drilling pits are fenced, lined and in good condition.