Well ID: 34-153-22949 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.0241002064,"lon":-81.5762009226,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2005-07-12 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 6 | |
Latitude: 41.0241002064 | |
Longitude: -81.5762009226 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1336192475 | 2005-07-15 | G&H Drilling is drilling on air in the top of the Big Lime. Should be near the salt later today. Will continue to monitor the site for any communication with Cargill. | ||||
-1675972990 | 2005-07-16 | I received a call from George Dixon with G&H reporting that they encountered water flow at approximately 2617'. The flow was manageable but they would have to switch over to fluid. I called Cargill to see if they noticed a drop in the cavern pressure when flow began. I am waiting for their call back. Dilling will continue as long as the flow can be managed. | ||||
-2102999251 | 2006-05-05 | The required fencing has been installed and the site has been graded. The charcoal filter, pressure relief valve and lightning arrestor still need to be installed. | 9-9-02 | |||
-2102999251 | 2006-05-05 | The required fencing has been installed and the site has been graded. The charcoal filter, pressure relief valve and lightning arrestor still need to be installed. | 9-9-05(A)10 | |||
-709136511 | 2010-09-09 | Status check inspection found no violations at this time. | ||||
-756561398 | 2005-07-08 | HB 278 Inspection. Bailey Excavating is starting to clear and grade the location. G&H Drilling should be moving to the location on July 11. | ||||
-849402867 | 2005-07-11 | HB 278 inspection - The drilling rig is moving on site and should start drilling with the next 24 hours. The first pit has been dug and will be lined for drilling the surface hole. The second pit will be dug tomorrow. | ||||
1120221408 | 2005-06-20 | HB 278 pre-permit site inspection. After seeing the site, I contacted Columbus with recommendations for permit conditions. | ||||
1123267286 | 2005-07-25 | G&H Drilling is moving off site. The drilling pits are full and need to be pumped down. I contacted Mike Schreiner who said that S&H would be on site later to at least take several loads. | ||||
151927778 | 2006-07-06 | The violation has been corrected. | 9-9-02 | |||
151927778 | 2006-07-06 | The violation has been corrected. | 9-9-05(A)10 | |||
1532275630 | 2006-04-04 | Status check inspection found that the well was in production but the required fencing was not installed and the well identification had not been posted. Additional grading and seeding is also required before the preliminary restoration is approved. Restoration will be due by the end of April. | 9-9-02 | |||
1532275630 | 2006-04-04 | Status check inspection found that the well was in production but the required fencing was not installed and the well identification had not been posted. Additional grading and seeding is also required before the preliminary restoration is approved. Restoration will be due by the end of April. | 9-9-05(A)10 | |||
1701286166 | 2005-07-14 | G&H is drilling out from under surface casing. No violations at this time. | ||||
1809332372 | 2006-07-17 | Preliminary restoration is approved. | ||||
319805247 | 2005-12-14 | The site has been rough graded and the tank battery has been set. Preliminary restoration will be completed as the weather permits. | ||||
352378930 | 2008-07-29 | I received a complaint from another landowner reporting a spill at the Bailey tank battery. It appears that one of the stock tanks was overfilled and a small amount of oil and/or brine was released into the tank battery. I will check again in 30 days to see what if any effect the spill had on nearby conifer trees. | ||||
532027009 | 2005-07-18 | Fluid flow is being managed and G&H is drilling ahead at approximately five minutes per foot. The pit liner on the center divider has fallen and needs to be repaired. | ||||
708807139 | 2006-03-13 | The well is in production. I contacted Mike Schreiner and told him that he needs to post the required ID, install the fencing around the well and the fencing around tank battery before the well goes into production. He said that he would contact Southway Fence to install the fencing and that he would post the required ID. |