If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-20687 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.0666522762,"lon":-81.0968524678,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-03-26 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.0666522762 | |
Longitude: -81.0968524678 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1074769049 | 2013-03-27 | On the day of my inspection Redstone was broke down and fixing rig. No violations noted. | ||||
-1236307928 | 2013-04-08 | On the day of my inspection there was no activity on the pad. A snow fence has been placed around the three existing well bores. Gulfport is planning to return to the pad and continue drilling in the near future. No violations noted. | ||||
-1361190215 | 2014-02-15 | On the day of my inspection I witnessed the surface casing being run and cement. See ticket for details. No violations noted. | ||||
-1899050325 | 2013-03-29 | On the day of my inspection Redstone had completed the conductor hole and Stingray was cementing conductor pipe. See ticket for details. No violations noted. | ||||
-403500922 | 2014-02-19 | On the day of my inspection I witnessed the first intermediate casing being run and cement. See ticket for details. No violations noted. | ||||
-789864949 | 2014-07-30 | On the day of my inspection the wells were equipped with the necessary equipment to be capable of production. No violations noted. | ||||
1151255791 | 2013-04-25 | On the day of my inspection drilling has not yet continued on this pad. Gulfport expected to resume drilling on pad in the near future. No violations noted. | ||||
1273055902 | 2013-05-01 | On the day of my inspection Redstone had reached TD and Stingray was set up to cement well. Casing was not straight and would not go into hole. New casing to arrive tomorrow. No violations noted. | ||||
1364827097 | 2013-04-01 | On the day of my inspection Redstone conductor rig moving off location. No violations noted | ||||
1500228657 | 2013-05-02 | On the day of my inspection Redstone was waiting for conductor casing to arrive. No violations noted. | ||||
1514169664 | 2013-03-26 | Received a call from Nick with Gulfport who advised that Redstone was drilling @ 80' and will be setting conductor @ 100' tomorrow. | ||||
2016363024 | 2013-03-28 | On the day of my inspection Redstone was drilling ahead @110'. No violations noted. | ||||
918746641 | 2014-02-24 | On the day of my inspection Sidewinder 60 was drilling ahead to kick off point. No violations noted. |