If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21100 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.4026545109,"lon":-81.1286184342,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.4026545109 | |
Longitude: -81.1286184342 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1351597318 | 2012-10-29 | I am on site this morning to witness the running and cementing of the 18 5 /8 Surface Casing string. I was advised that they would be ready at 8:00 am today. During my inspection this moring it was determined that casing would be cemented later today around 2 pm. I did return around 3 pm and found that the job was still running behind and would now be after 5 pm. Around 6 pm I received a phone from H&P 285 asking if they could set the minimum casing of 300 ft. I advised that they could. I was then advised that the cementers would be hooked up shortly and would begin cementing A.S.A.P. I returned to the site to witness the cementing and remained on site for several more hours. When I left they were not hooked up to cement the well and they felt it would be only a few more hours. | ||||
1786919112 | 2012-10-06 | I am on site today to witness the running and cementing of the conductor string. Lightning Well Service set 100 ft of 24 inch conductor. Petroset Cementing used 80 sks of Class A to cement casing. Had good returns |