Well Details

Well ID: 34-153-22651
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1990-03-24
Unconventional:
Horizontal:
Producing: No
Violations: 5
Latitude: 40.9292998036
Longitude: -81.4569992872

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
109635598 2006-04-28 Status check inspection found a leaking stuffing box, no identification on the tank battery and insufficient secondary containment. I called George Strawn and informed him of the deficiencies at this site. He stated that the problems will be corrected. 9-1-07
109635598 2006-04-28 Status check inspection found a leaking stuffing box, no identification on the tank battery and insufficient secondary containment. I called George Strawn and informed him of the deficiencies at this site. He stated that the problems will be corrected. 9-9-05(A)10
2041982641 2006-05-12 The impacted area has been remediated, the tank battery has been sand blasted and painted and the containment dike has been extended. The NOV has been corrected. 9-1-07
2041982641 2006-05-12 The impacted area has been remediated, the tank battery has been sand blasted and painted and the containment dike has been extended. The NOV has been corrected. 9-9-05(A)10
73912560 2014-03-14 I inspected this well and tank battery on 3/14/2014. The tank battery consists of a 100 Bbl. Stock tank, 50 Bbl. Poly brine and vertical separator. The dike is insufficent on the North side to contain the fluids within the diked area. I found a unplugged drain pipe in the dike that would allow any fluids to breach the dike. The access road was graveled and passable. All the required identification was in place and legible. The proper spacing between the tank and separator was observed. All loadlines were secured and locked. The well consisted of a Churchill Model 40 pumping unit with the associated pumping well plumbing and was leak free. The electrical box was locked as required. In order to bring the Kuhar #1 into compliance the Owner shall remove the dike drain and rebuild the North side of the tank battery dike to a height sufficent to contain stored fluids. Owner shall use an impervious material to reconstruct the dike. No other violations were identified during this inspection. NONE(B)
PL4142 Preliminary Restoration done information from Data Point