| Well ID: 34-059-24188 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.9460182392,"lon":-81.6650963923,"icon":""}]} |
| County: | |
| Municipality: | |
| Operator Name: | |
| Well Pad ID: | |
| Farm/Lease Name: | |
| First Permit Date: | |
| Last Permit Date: | |
| Spud Date: 2011-08-29 | |
| Unconventional: | |
| Horizontal: | |
| Producing: No | |
| Violations: 0 | |
| Latitude: 39.9460182392 | |
| Longitude: -81.6650963923 |
| PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
|---|
| PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
|---|
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
|---|---|---|---|---|---|---|
| -1245448674 | 2012-01-27 | I was on site to witness loading and testing of 6" line going to wellhead. There is a 3" flowline, inside the 6" line, that is to be used as an injection line for well. They tested outer line at @ 1000 PSI and monitored pressure for 30 minutes with no decline. They will test the injection line once the pump and filter housings are placed at pumphouse. | ||||
| -1280249550 | 2014-08-18 | Inspection revealed that injection pump was in operation during my inspection. | ||||
| -1328644386 | 2013-05-02 | Restoration work at site is satisfactory pit has been filled in and site restored and vegetation has been established. | ||||
| -1420948626 | 2013-06-27 | Inspection revealed that injection pump was in operation today and it was noted that two Buckeye Water Services vacuum trucks were unloading at site during my inspection. | ||||
| -1446107755 | 2012-05-30 | Inspection revealed that injection pump was not in operation during my inspection and it was noted that there was two Whip stock Vac trucks unloading at facility during my inspection.
Note: 111,398 bbls of brine has been disposed of since well went into operation. |
||||
| -1527131983 | 2012-10-31 | Inspection revealed that injection pump was in operation during my inspection and it was noted that annulus pressure was at zero and I suggested to operator that they have pressure applied to annulus as soon as possible.
Note: 238,810 bbl has been disposed of since well went into operation. |
||||
| -1533242025 | 2012-01-31 | On site to witness pressure testing of 3" flow line going to well we tested it @1800 psi and monitored pressure for 20 min with no decline in pressure TEST PASSED).
Note: Flow line to well is approximately 3000' long and is encased inside of 6" casing which was pressure tested also at a earlier date. Well is now in operation and pressure noted during pumping was noted @ 500 psi. |
||||
| -1565627199 | 2013-03-01 | Restoration work at site satisfactory pit has been filled in and site restored and vegetation has been established. | ||||
| -158499863 | 2014-03-07 | Inspection revealed that injection pump was in operation and it was noted that three Buckeye Water Service vacuum trucks were unloading at facility during my inspection. | ||||
| -1672225450 | 2014-01-17 | Inspection revealed that injection pump was in operation today and is was noted that one Buckeye Water Service vacuum truck was unloading at facility during my inspection.
Note: Unloading pad and storage tanks are being shared with permit#4067. |
||||
| -1820047479 | 2012-12-06 | Inspection revealed that injection pump was in operation and there was three Buckeye Water Services vacuum truck on unloading pad during my inspection and it was noted that facility was clean and neat this inspection. | ||||
| -1841746550 | 2012-08-21 | On site with UIC Director and group from Central Office to inspect well site and surface facility and discuss any issues with well operator concerning facility. | ||||
| -188966782 | 2013-03-27 | Inspection revealed that injection pump was not in operation during my inspection and it was noted that three Buckeye Water Services vacuum trucks were unloading at facility during my inspection. | ||||
| -1966081343 | 2011-09-22 | Rig drilling on fluid @7920'. Anticipating bit trip around 8000' and if all goes well they should be at total depth by 9/27/11. | ||||
| -1983670855 | 2013-01-17 | On site with company personnel Don Krieger and John Suhar to review injection well monitoring charts to try and determine if there is a possibility of leakage in tubing or packer after reviewing data it was determined that annulus pressure increase was due to thermal expansion to down hole fluid when well is not in operation. | ||||
| -2072737888 | 2014-04-01 | Inspection revealed that injection pump was in operation today and it was noted that one Buckeye Water Service vacuum truck was unloading at facility during my inspection. | ||||
| -258660706 | 2012-12-18 | Inspection revealed that injection pump was in operation and facility appears to be in satisfactory condition this inspection.
Note: 286,536 bbl of water has been disposed of since well went into operation. |
||||
| -346200819 | 2011-09-14 | Drilling rig breaking down core barrel @6500'. They have one more 90' core to run and then they will resume drilling stratigraphic test well. | ||||
| -40806047 | 2014-08-29 | On site to perform mini test on annulus of tubing after changing out 2" valve on well head,Swenny Well Service pressured up on the annulus of tubing for well owner. | ||||
| -485676492 | 2014-07-15 | Inspection revealed that injection pump was in operation today and it was noted that one Buckeye Water Service vacuum truck was unloading at facility during my inspection. | ||||
| -544987188 | 2014-02-11 | Inspection revealed that injection pump was in operation during my inspection.
Note: Walked flow line area to monitor area for any potential leaks none were found on this day of my inspection. |
||||
| -733855447 | 2013-01-30 | Inspection revealed that injection pump was not running during my inspection and it was noted that brine filter skid has one chamber in need of replacement, talked to well operator and he stated that they have one ordered and it should be replaced by the end of the week. | ||||
| -896724787 | 2013-05-30 | Inspection revealed that injection pump was in operation during my inspection and it was noted that Huey Trucking was unloading at facility during my inspection. | ||||
| 1125303703 | 2012-05-14 | Inspection revealed that injection pump was in operation during my inspection.
Note: Restoration work at site has been completed pits have been closed and site restored and vegetation has been established. |
||||
| 1306161723 | 2014-05-09 | Inspection revealed that injection pump was in operation during my inspection and it was noted that one H&L Water Services vacuum truck was unloading at facility during my inspection. | ||||
| 1315768370 | 2011-09-11 | Drill rig was pulling core barrel @6364'. They have three more runs to make and should be done with Utica section by late evening of 9/12/2011. | ||||
| 1318893312 | 2011-10-17 | Witness running of bond log by Appalachian Well Service. The cement on bottom and at @ 6350' appeared ratty. There was two stage tool at @ 6052' and the cement on top of it was ratty for 200' then a good bond was achieved to the top of cement at @ 4200'. | ||||
| 1319579119 | 2011-10-25 | Inspected site at request of UIC Director too check area for any potential water wells and any fresh water sources none were found within 500' area of wellhead.
Note: Discussed flow line installation with company rep and it was agreed upon that flow line would be encased with 6" line pipe and flow line would be 3" heavy weight line pipe. |
||||
| 1323387249 | 2011-12-06 | On site to witness packer and tubing run into well. The rig crew ran a Baker A-3 Set Lok into the well along with 2.875" tubing. The packer was set at @ 7198' and Producers Service flushed the annulus of the tubing and added and inhibitor. They tested the backside of the tubing at @ 2050 psi and we monitored pressure for 15 minutes with no decline in pressure. The owner will begin laying flow line to the well and install additional tanks at the facility in the near future. | ||||
| 1325164054 | 2011-12-28 | On site to witness operator install four new 300 bbl tanks at facility and begin plumbing them up and owner is awaiting on injection pump to arrive and then they will plumb it up and flow line is being installed and once in place it will be tested and once test is completed they will place well into operation. | ||||
| 1325709733 | 2012-01-04 | On site to witness operator place flow line to wellhead and plumb it up, they have 6" line pipe welded with 3" pipe inside of it and once all line is in place they will test 3" to maximum injection pressure and then fill backside of 3" with fresh water and inhibitor and then pressure test 6" casing to the same pressure too insure it has integrity. | ||||
| 1330550051 | 2012-02-29 | Inspection revealed that injection pump was in operation during my inspection.
Note: Walked flow line path to monitor area for any potential leaks none found) owner will need to complete restoration work at site as soon as weather permits. |
||||
| 1334741817 | 2012-04-17 | Inspection revealed that restoration work at site is nearly completed and injection pump was not in operation during my inspection, walked flow line area to monitor area for possible leaks none found.
Note: 81,385 bbl of brine disposed of since well went into operation. |
||||
| 1352490013 | 2012-11-09 | Inspection revealed that Sweeny Well Service on site to apply pressure to annulus of tubing, they applied 350 psi and we monitored pressure for 15 minutes with no decline in pressure TEST PASSED, injection pump was not in operation during my inspection. | ||||
| 1483584158 | 2012-08-06 | Inspection revealed that injection pump was not in operation during my inspection, company rep on site having discussion with contractor concerning cleaning out of storage tanks and hauling off of material to a approved landfill.
Note: 165,010 bbl has been disposed of since well went into operation. |
||||
| 1522712371 | 2013-08-19 | Inspection revealed that injection pump was in operation during my inspection. | ||||
| 1663493176 | 2012-03-30 | Inspection revealed that pump was in operation today, Sweeny Well Service on site to pressure test annulus of tubing they applied 300 psi and we monitored pressure for 15 min. with no decline in pressure.
68,199 bbl disposed of since well went into operation. |
||||
| 1760028506 | 2013-12-05 | Inspection revealed that injection pump was in operation today and it was noted that one Buckeye Water Services vacuum truck was unloading at facility during my inspection. | ||||
| 1766905151 | 2012-10-22 | Inspection revealed that injection pump was in operation during my inspection and annulus pressure needs to be applied to annulus of tubing in the near future.
Note: 224,763 barrel of water has been disposed of since well went into operation. |
||||
| 1894509616 | 2014-04-15 | Inspection revealed that injection pump was in operation during my inspection and it was noted that two H&L Water vacuum trucks were unloading at facility during my inspection. | ||||
| 1976086669 | 2012-06-25 | Inspection revealed that injection pump was not in operation during my inspection and it was noted that one Enervest vac truck was unloading brine during my inspection and one Buckeye Water Services truck was also at facility on this day. | ||||
| 2011699035 | 2013-10-15 | Inspection revealed that injection pump was in operation during my inspection . | ||||
| 2040431598 | 2013-03-01 | Inspection revealed that injection pump was not in operation today and in conversation with well attendant stating that they were pretty slow in receiving disposal fluids this week. | ||||
| 2058325733 | 2012-04-25 | Inspection revealed that well was in operation on this day, well caretaker was changing filters during my inspection and it was noted that Buckeye Water Services was unloading tanker truck at site. | ||||
| 2076688647 | 2013-05-02 | Inspection revealed that injection pump was not in operation during my inspection.
Note: Walked flow line area to check area for and possible leakage. |
||||
| 235954856 | 2012-12-06 | Restoration work at site satisfactory pit has been filled and site has vegetation established. | ||||
| 321806442 | 2013-11-12 | Inspection revealed that injection pump was in operation today and it was noted that one Buckeye Water Service vacuum truck was unloading at facility during my inspection. | ||||
| 3752825 | 2013-04-08 | Inspection revealed that injection pump was not in operation during my inspection and I walked flow line area to monitor area for leaks, none were found. | ||||
| 399022251 | 2014-06-03 | Inspection revealed that injection pump was in operation today and it was noted that one H&L Water Service vacuum truck was unloading at this facility on the day of my inspection. | ||||
| 621058224 | 2012-03-05 | Inspection revealed that well is in operation and new pump is working fine.
Note: Area of new flow line needs to be reclaimed as weather permits and drill site needs to be reclaimed also as weather permits. 37,162 bbl disposed of since well went into operation |
||||
| 662109788 | 2013-07-19 | Inspection revealed that injection pump was in operation today and it was noted that one H&L Water Haulers tanker was unloading at site during my inspection. | ||||
| 789103433 | 2011-09-28 | Total depth has been achieved 8856' they will mix mud then short trip out then go back to bottom and condition hole should be running casing in the early morning hours. | ||||
| 850319517 | 2011-09-26 | Rig drilling on fluid at @8570'. Drill rate @5-6 min/ft. Should reach total depth later this week. | ||||
| 93771870 | 2014-04-01 | I am accompanying inspector Dave Ball. My inspection finds the well is operating at a tubing pressure of 1450 psi and an annular pressure of 310 psi. |