X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-059-24188

Well Details

Well ID: 34-059-24188
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2011-08-29
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 39.9460182392
Longitude: -81.6650963923

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1245448674 2012-01-27 I was on site to witness loading and testing of 6" line going to wellhead. There is a 3" flowline, inside the 6" line, that is to be used as an injection line for well. They tested outer line at @ 1000 PSI and monitored pressure for 30 minutes with no decline. They will test the injection line once the pump and filter housings are placed at pumphouse.
-1280249550 2014-08-18 Inspection revealed that injection pump was in operation during my inspection.
-1328644386 2013-05-02 Restoration work at site is satisfactory pit has been filled in and site restored and vegetation has been established.
-1420948626 2013-06-27 Inspection revealed that injection pump was in operation today and it was noted that two Buckeye Water Services vacuum trucks were unloading at site during my inspection.
-1446107755 2012-05-30 Inspection revealed that injection pump was not in operation during my inspection and it was noted that there was two Whip stock Vac trucks unloading at facility during my inspection.

Note: 111,398 bbls of brine has been disposed of since well went into operation.

-1527131983 2012-10-31 Inspection revealed that injection pump was in operation during my inspection and it was noted that annulus pressure was at zero and I suggested to operator that they have pressure applied to annulus as soon as possible.

Note: 238,810 bbl has been disposed of since well went into operation.

-1533242025 2012-01-31 On site to witness pressure testing of 3" flow line going to well we tested it @1800 psi and monitored pressure for 20 min with no decline in pressure TEST PASSED).

Note: Flow line to well is approximately 3000' long and is encased inside of 6" casing which was pressure tested also at a earlier date. Well is now in operation and pressure noted during pumping was noted @ 500 psi.

-1565627199 2013-03-01 Restoration work at site satisfactory pit has been filled in and site restored and vegetation has been established.
-158499863 2014-03-07 Inspection revealed that injection pump was in operation and it was noted that three Buckeye Water Service vacuum trucks were unloading at facility during my inspection.
-1672225450 2014-01-17 Inspection revealed that injection pump was in operation today and is was noted that one Buckeye Water Service vacuum truck was unloading at facility during my inspection.

Note: Unloading pad and storage tanks are being shared with permit#4067.

-1820047479 2012-12-06 Inspection revealed that injection pump was in operation and there was three Buckeye Water Services vacuum truck on unloading pad during my inspection and it was noted that facility was clean and neat this inspection.
-1841746550 2012-08-21 On site with UIC Director and group from Central Office to inspect well site and surface facility and discuss any issues with well operator concerning facility.
-188966782 2013-03-27 Inspection revealed that injection pump was not in operation during my inspection and it was noted that three Buckeye Water Services vacuum trucks were unloading at facility during my inspection.
-1966081343 2011-09-22 Rig drilling on fluid @7920'. Anticipating bit trip around 8000' and if all goes well they should be at total depth by 9/27/11.
-1983670855 2013-01-17 On site with company personnel Don Krieger and John Suhar to review injection well monitoring charts to try and determine if there is a possibility of leakage in tubing or packer after reviewing data it was determined that annulus pressure increase was due to thermal expansion to down hole fluid when well is not in operation.
-2072737888 2014-04-01 Inspection revealed that injection pump was in operation today and it was noted that one Buckeye Water Service vacuum truck was unloading at facility during my inspection.
-258660706 2012-12-18 Inspection revealed that injection pump was in operation and facility appears to be in satisfactory condition this inspection.

Note: 286,536 bbl of water has been disposed of since well went into operation.

-346200819 2011-09-14 Drilling rig breaking down core barrel @6500'. They have one more 90' core to run and then they will resume drilling stratigraphic test well.
-40806047 2014-08-29 On site to perform mini test on annulus of tubing after changing out 2" valve on well head,Swenny Well Service pressured up on the annulus of tubing for well owner.
-485676492 2014-07-15 Inspection revealed that injection pump was in operation today and it was noted that one Buckeye Water Service vacuum truck was unloading at facility during my inspection.
-544987188 2014-02-11 Inspection revealed that injection pump was in operation during my inspection.

Note: Walked flow line area to monitor area for any potential leaks none were found on this day of my inspection.

-733855447 2013-01-30 Inspection revealed that injection pump was not running during my inspection and it was noted that brine filter skid has one chamber in need of replacement, talked to well operator and he stated that they have one ordered and it should be replaced by the end of the week.
-896724787 2013-05-30 Inspection revealed that injection pump was in operation during my inspection and it was noted that Huey Trucking was unloading at facility during my inspection.
1125303703 2012-05-14 Inspection revealed that injection pump was in operation during my inspection.

Note: Restoration work at site has been completed pits have been closed and site restored and vegetation has been established.

1306161723 2014-05-09 Inspection revealed that injection pump was in operation during my inspection and it was noted that one H&L Water Services vacuum truck was unloading at facility during my inspection.
1315768370 2011-09-11 Drill rig was pulling core barrel @6364'. They have three more runs to make and should be done with Utica section by late evening of 9/12/2011.
1318893312 2011-10-17 Witness running of bond log by Appalachian Well Service. The cement on bottom and at @ 6350' appeared ratty. There was two stage tool at @ 6052' and the cement on top of it was ratty for 200' then a good bond was achieved to the top of cement at @ 4200'.
1319579119 2011-10-25 Inspected site at request of UIC Director too check area for any potential water wells and any fresh water sources none were found within 500' area of wellhead.

Note: Discussed flow line installation with company rep and it was agreed upon that flow line would be encased with 6" line pipe and flow line would be 3" heavy weight line pipe.

1323387249 2011-12-06 On site to witness packer and tubing run into well. The rig crew ran a Baker A-3 Set Lok into the well along with 2.875" tubing. The packer was set at @ 7198' and Producers Service flushed the annulus of the tubing and added and inhibitor. They tested the backside of the tubing at @ 2050 psi and we monitored pressure for 15 minutes with no decline in pressure. The owner will begin laying flow line to the well and install additional tanks at the facility in the near future.
1325164054 2011-12-28 On site to witness operator install four new 300 bbl tanks at facility and begin plumbing them up and owner is awaiting on injection pump to arrive and then they will plumb it up and flow line is being installed and once in place it will be tested and once test is completed they will place well into operation.
1325709733 2012-01-04 On site to witness operator place flow line to wellhead and plumb it up, they have 6" line pipe welded with 3" pipe inside of it and once all line is in place they will test 3" to maximum injection pressure and then fill backside of 3" with fresh water and inhibitor and then pressure test 6" casing to the same pressure too insure it has integrity.
1330550051 2012-02-29 Inspection revealed that injection pump was in operation during my inspection.

Note: Walked flow line path to monitor area for any potential leaks none found) owner will need to complete restoration work at site as soon as weather permits.

1334741817 2012-04-17 Inspection revealed that restoration work at site is nearly completed and injection pump was not in operation during my inspection, walked flow line area to monitor area for possible leaks none found.

Note: 81,385 bbl of brine disposed of since well went into operation.

1352490013 2012-11-09 Inspection revealed that Sweeny Well Service on site to apply pressure to annulus of tubing, they applied 350 psi and we monitored pressure for 15 minutes with no decline in pressure TEST PASSED, injection pump was not in operation during my inspection.
1483584158 2012-08-06 Inspection revealed that injection pump was not in operation during my inspection, company rep on site having discussion with contractor concerning cleaning out of storage tanks and hauling off of material to a approved landfill.

Note: 165,010 bbl has been disposed of since well went into operation.

1522712371 2013-08-19 Inspection revealed that injection pump was in operation during my inspection.
1663493176 2012-03-30 Inspection revealed that pump was in operation today, Sweeny Well Service on site to pressure test annulus of tubing they applied 300 psi and we monitored pressure for 15 min. with no decline in pressure.

68,199 bbl disposed of since well went into operation.

1760028506 2013-12-05 Inspection revealed that injection pump was in operation today and it was noted that one Buckeye Water Services vacuum truck was unloading at facility during my inspection.
1766905151 2012-10-22 Inspection revealed that injection pump was in operation during my inspection and annulus pressure needs to be applied to annulus of tubing in the near future.

Note: 224,763 barrel of water has been disposed of since well went into operation.

1894509616 2014-04-15 Inspection revealed that injection pump was in operation during my inspection and it was noted that two H&L Water vacuum trucks were unloading at facility during my inspection.
1976086669 2012-06-25 Inspection revealed that injection pump was not in operation during my inspection and it was noted that one Enervest vac truck was unloading brine during my inspection and one Buckeye Water Services truck was also at facility on this day.
2011699035 2013-10-15 Inspection revealed that injection pump was in operation during my inspection .
2040431598 2013-03-01 Inspection revealed that injection pump was not in operation today and in conversation with well attendant stating that they were pretty slow in receiving disposal fluids this week.
2058325733 2012-04-25 Inspection revealed that well was in operation on this day, well caretaker was changing filters during my inspection and it was noted that Buckeye Water Services was unloading tanker truck at site.
2076688647 2013-05-02 Inspection revealed that injection pump was not in operation during my inspection.

Note: Walked flow line area to check area for and possible leakage.

235954856 2012-12-06 Restoration work at site satisfactory pit has been filled and site has vegetation established.
321806442 2013-11-12 Inspection revealed that injection pump was in operation today and it was noted that one Buckeye Water Service vacuum truck was unloading at facility during my inspection.
3752825 2013-04-08 Inspection revealed that injection pump was not in operation during my inspection and I walked flow line area to monitor area for leaks, none were found.
399022251 2014-06-03 Inspection revealed that injection pump was in operation today and it was noted that one H&L Water Service vacuum truck was unloading at this facility on the day of my inspection.
621058224 2012-03-05 Inspection revealed that well is in operation and new pump is working fine.

Note: Area of new flow line needs to be reclaimed as weather permits and drill site needs to be reclaimed also as weather permits. 37,162 bbl disposed of since well went into operation

662109788 2013-07-19 Inspection revealed that injection pump was in operation today and it was noted that one H&L Water Haulers tanker was unloading at site during my inspection.
789103433 2011-09-28 Total depth has been achieved 8856' they will mix mud then short trip out then go back to bottom and condition hole should be running casing in the early morning hours.
850319517 2011-09-26 Rig drilling on fluid at @8570'. Drill rate @5-6 min/ft. Should reach total depth later this week.
93771870 2014-04-01 I am accompanying inspector Dave Ball. My inspection finds the well is operating at a tubing pressure of 1450 psi and an annular pressure of 310 psi.