-1155049992
|
2003-05-12
|
|
Ready to start drilling out the 7" casing. After the casing has been reamed out, the casing will be cut off and removed.
|
|
|
|
-483988327
|
2003-05-14
|
|
Finish drilling out the 7" casing. Will start out of the hole with tubing today and finish tomorrow. Casing will be shot off tomorrow.
|
|
|
|
-811004698
|
2003-05-15
|
|
Timco was retained by Cargill to shoot off the 7" casing. The casing was shot at two intervals before it finally released.
|
|
|
|
1129240926
|
2003-05-20
|
|
Zane Petroleum successfully fished out and was starting to pull the 7" casing. Should be ready to start plugging this well this week.
|
|
|
|
1535028064
|
2013-07-31
|
|
No indication of well equipment, access road, or tank battery.
|
|
|
|
2100303044
|
2003-05-23
|
|
Baker Atlas was on site to place a wireline bridge plug prior to abandoning this well. Baker did not have the proper equipment to set the plug and had to reschedule.
|
|
|
|