If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-151-25690 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.8292075947,"lon":-81.5008960874,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2011-01-19 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.8292075947 | |
Longitude: -81.5008960874 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1086695104 | 2011-03-01 | Training for Ray Wallace on well construction | ||||
-332653707 | 2012-01-09 | On 1/9/2012, I performed a status check on the above well site. The well is in production, the site is reclaimed and identification signs are posted. The Preliminary Reatoration is PASSED. | ||||
-472226251 | 2011-03-01 | Producers Services Corporation (PSC) fraced the well today. I witnessed the entire job with Rick Liddle (OVE), Ray Wallace (ODNR), and Chris Grimm (ODNR). Breakdown Pressure 1330 psi. Average Treating Pressure 37 bpm at 1742 psi. Total Fluid Volume 112,063 gals. Total Sand 788 sacks. Flush 12,061 gals. Instant Shut In (ISI) 1123 psi. After 5 min. 1100 psi. Hydraulic Horse Power (HHP) 1580. The job was completed with no problems. | ||||
1297789016 | 2011-02-14 | Solidifying the drilling pits today. | ||||
1299521629 | 2011-01-20 | Training Ray Wallace Surface cement job. | ||||
282299046 | 2011-04-28 | The well is completed and the tank battery is set. The location is rough graded. |