Well ID: 34-019-22113 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.4654891463,"lon":-81.0416827927,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-08-12 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.4654891463 | |
Longitude: -81.0416827927 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1342785218 | 2012-07-18 | I was on site to check the status of the construction of the well site / lease road. My inspection revealed that the contractor is working on the lease road entrance along State Route 164 and rock trucks are hauling / spreading stone on the lease road. I didn't inspect the well site at this time because of all the construction activity at the lease road entrance and there was no where to park the vehicle, so I wasn't parked on or along State Route 164. I was advised earlier in the week that a conductor rig should be on site sometime toward the end of this week. | ||||
1344834120 | 2012-08-13 | I was on site to witness the cementing of the 13 3/8" surface casing. My inspection revealed that Patterson Rig # 328 has reached a total depth of 490' and ran 484' of 13 3/8" surface casing. Five centralizers were installed on the casing string (on joints 1,2,4,7,10). O-TEX cemented the casing with 450 sacks of Class "H" cement ( 2% CaCl, .27% Cello-flake, and .4% C-41P). The cement density was 15.6 pounds per gallon with a yield of 1.2 cubic feet per sack. There was good circulation throughout the job and 18 barrels of cement was circulated to surface. Total displacement to land the plug was 68 barrels of freshwater. | ||||
1345116253 | 2012-08-16 | I was on site to witness the cementing of the 9 5/8" intermediate casing string. My inspection revealed that Patterson Rig # 328 has drilled a 12.25" hole to a total depth of 1754' and ran 1750' of 9 5/8" casing with 14 centralizers installed on the casing string (on joints 1,2,5,8,11,14,17,20,23,26,29,32,35,38). O-TEX cemented the casing with 630 sacks of Class"H" 10% NaCl , .27% Cello-Flake , 4/10% C-41P, 1/10% C-35.There was good circulation throughout the job and approximately 24 barrels of cement circulated to surface. No violations noted during this inspection. | ||||
1345753830 | 2012-08-23 | I was on site to check the status of Patterson Drilling Rig # 328. My inspection revealed that Patterson Rig# 328 is drilling the lateral section of the well at 10,862 feet. They should reach total depth on this well sometime this weekend. I walked the location and no violations were noted at this time. |