If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22984 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.0169251957,"lon":-81.5512397707,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2006-09-26 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 41.0169251957 | |
Longitude: -81.5512397707 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1264489997 | 2006-09-29 | Completed the BOP test before drilling out from under surface casing. | ||||
-1510151906 | 2006-09-25 | Poulson Drilling is moving on the location and should spud in the next day. The pits are being dug and will be lined. | ||||
-1689048540 | 2007-05-23 | Preliminary restoration is approved. | ||||
1161557070 | 2006-10-17 | The drilling pits have been solidified and closed. No violations at this time. | ||||
1643289503 | 2007-01-08 | The well has been completed and is in production. Preliminary restoration will be approved as soon as the site has been seeded and is growing. Preliminary restoration is not due until June. | ||||
1681509902 | 2006-09-27 | Drilling of the surface hole is continuing. Should be ready to run and cement casing later today. The pits are lined and in good condition. The location is fenced off and the required identification is posted. No violations at this time. | ||||
845002543 | 2006-10-02 | Drilling has been completed and the rig is running production casing. The pits are lined and in good condition. |