34-081-61055

Well Details

Well ID: 34-081-61055
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date:
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 40.5038300976
Longitude: -80.6922006105

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1160559831 2013-09-10 I was onsite to witness the cementing of the Berea Sandstone plug. The well was holeshot with nitroglycerin and we pumped 180 sacks at 15.6ppg to fill the void. The cement will set and we will tage it to then top off the plug.
-1695558268 2013-07-24 I was on location with ODNR inspector Pat Shreve to try and determine what is in the hole and what will need done to properly plug this well when the permit to plug and abandon is used and a plugging rigs comes on location. We determined that there is likely casing on hangers with packing in the hole, likely being 2' and 3' inside. It was also agreed upon that a full cement plug would need to be cemented in this well to properly plug the well. Information from offset wells was also collected at this time to try and determine what could possibly in the well when it comes time to plug. Each one of the 10 wells on the property could have different downhole properties and each well will need to be addressed separately.
-27093670 2013-09-11 Tagged cement top at 463. Ran 2.375upset tubing in and Cemenco cemented back to surface with 90 sacks of regular class A cement.
-619178420 2013-09-09 Saftey meeting and started pulling 1tubing out. Pulled out 1017'of 1tubing, 1341'of 2tubing. There was a gas escape sit-down packer at 1017'.
1044656989 2013-09-10 Contractors called on the status they were running 2.375upset tubing to 1250'with a mud anchor. They had Cemenco run in with 180 sacks of class A cement and then trip tubing all out. Good circulation. Will tag tomorrow.
1297698022 2013-07-23 I was on location to see if any work has been done on this well that has been excavated out so that access to the well can be had. Currently lines from the well are running to a 1000L holding tank in case the wells produce any fluid. No changes to the wells have been completed at this time.
1375790763 2013-07-24 Well is old shackle well with 6.625surface and gas escape packer. 2tubing and 1tubing with old grass hopper shacle jack. There is a 100 gal plastic tank on site. Well is idle and not capable.
1378906455 2013-09-06 Saftey meeting and then started pulling rods out of well. Pulled 720'of steel rods and 621'of wooden rods.
1379086536 2013-09-09 Was on location to pull 1" tubing. Pulled in total 1017' of tubing. Also pulled 2" tubing with a total of 1341' being pulled. There was a gas escape packer at 1017'.
1656333366 2013-09-11 We tagged cement to 463' and ran 2.375' upset tubing in and Cemenco cemented back to surface with 90 sacks of class A cement. They will rig down and move on to the next well to be plugged after cutting down the casing at surface.