34-121-24408

Well Details

Well ID: 34-121-24408
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-04-24
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 39.8640325445
Longitude: -81.4308373322

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-406008404 2013-05-10 I am on site to witness Superior cement 564' of 18.625" casing in place.
-571464738 2013-12-18 The preliminary restoration requirements have been met.
1368468596 2013-05-08 My inspection finds the rig ran 18.625" casing to 415' and is attempting to circulate it to a total depth of 490'.
1368470222 2013-05-09 My inspection finds that after tripping the casing out of the hole the driller cleaned the hole down to 565' The operator anticipates running 564' of 18.625" casing as soon as the rig is repaired.
1368826177 2013-05-16 I am onsite to witness Patterson rig 343 run 2038' of 13.375" casing. Superior is cementing the casing in place with class A cement.
1396276510 2014-03-31 My inspection finds well is in production. The tank battery consists of eighteen 400 bbl tanks that are shared with three other wells. The identification is posted as required. The well site is being prepared for a drilling rig.
432792806 2013-04-25 My inspection today finds the operator has began to drill. Ransom drilling is drilling at a depth of 65'.
858615860 2013-06-04 My inspection today finds the drilling rig is drilling 8.75" hole at a depth of 14722'. They are expecting to reach total depth by the end of the day.
951703589 2013-05-28 The drilling contractor is tripping in the hole to drill out the cement stage tool.