Well ID: 34-029-21708 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-04-18 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.7383953606 | |
Longitude: -80.868246878 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1472293748 | 2013-04-05 | |||||
1365512343 | 2013-02-21 | I went to the site and conducted a pre-construction site inspection with Brett Bell, Chesapeake Field Representative. | ||||
1365605309 | 2013-04-07 | I was at the site to check the completion of the conductor drilling operation. The conductor casing was installed and cemented, and Express Energy Services was drilling the mouse hole. | ||||
1366632534 | 2013-04-20 | I was on location for the cementing of the intermediate casing. The drill depth was 1420 ft, with a 12.25 inch hole and 9.625 inch conductor casing placed at a depth of 1402 ft. The proper circulation was established and cementing was started by Schlumberger using Class A cement with a yeild of 1.2 percent. The beginning mud scale of cement was a density of 15.3 pounds per gallon (ppg). They adjusted the density to 15.8 ppg and proceeded cementing. The final mud scale from the returns showed a density of 14.7 ppg. 24 BBLs of returns were determined. The plug was displaced and landed. It was held for 5 minutes at 500 psi. The well site was in good repair with the proper containment in place. The lease road and well pad were in stable condition. The permit was in the company man's trailer. Fire extinguishers were readily available during the job. | ||||
2051182138 | 2013-04-09 | I went to the site to inspect the completion of the conductor casing, mouse hole and cellar installation. The installation was complete, and the cellar was enclosed with gates. The results of the drilling and installation will be described in the casing ticket report. | ||||
280647266 | 2013-04-18 | |||||
495262838 | 2014-05-20 | |||||
863364253 | 2013-04-05 | I was at the site to check the progress on the conductor drilling operation. Express Drilling completed the drilling of the conductor hole to 120' and is in the progress of installing 20" conductor casing. |