Well Details

Well ID: 34-119-28587
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2006-04-20
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 39.8822177335
Longitude: -81.8375683819

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1113179740 2006-08-21 Growth everywhere but over pits and kill area. Talked to John Dosch and he will disc and reseed in Sept. when rain comes.
-1232168105 2006-06-21 Graded seeded and mulched. No growth yet. Spill area has been heavily limed and seeded and mulched. No growth yet.
-1574746486 2012-09-12 Well was plugged and ground was disked and graded. Seed was spread on site and all production equipment was removed. Will check back at later date to check vegetation.
-373163885 2014-04-14 Final Restoration passed on 4-14-14 by Patrick Shreve.
1146506174 2006-05-01 Found that fluid left (or was blown from) the pit and made its way to the creek where there was a small fish fill. Some grasses and brush (multi-flora rose) was also killed in the spill. Unable to determine at this time if trees were also killed.
1252004558 2009-08-28 Some growth after liming and reseeding and mulching gare areas, but not too much. Called John Dosch and asked him to remove the contaminated soil and to put down pelletized lime and topsoil and seed and mulch before bad weather.
1284011323 2006-09-21 Reseeded Kill area. Good growth now but will wait til spring for final look.
1347287453 2012-09-10 Chipco rig in at well and pulling rods. Company will set a bottom plug at 4525-4125 and run 30 sacks of cement at Class A .
1347539210 2012-09-11 Chipco is plugging well back to surface. Lime Plug is set at 3289-3089. Berea plug is set at 1456-1231'. The bottom of surface is set at 1122-922'. Surface plug set at 200-0. All plugs circulated.
1823293001 2007-01-04 Good growth in spill area.
1913713478 2006-05-23
2060726829 2009-06-08 Brine spill remediation: some areas are growing well but there are several areas where there is no growth. (pics) Called John Dosch and he argeed to remediate (again) scald areas.
2075853062 2012-09-10 I accompanied Pat Shreve on a Chipco plug job as part of training, and we witnessed the plugging of a Clinton well from TD to surface.
699804754 2009-09-21 Road repaired seeded and mulched. Pit area with no growth has been repaired and seeded and manured.
895230823 2009-06-29 Scald areas limed, seeded and mulched. Lease road still needs fixed to remove eroded areas. Called John Dosch.