If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23060 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.9349396534,"lon":-81.6303309489,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2009-04-13 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.9349396534 | |
Longitude: -81.6303309489 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1782660146 | 2009-04-15 | Whipstock is drilling ahead in the Ohio Shale. The pits are fenced, lined and in good condition. | ||||
-1803362256 | 2009-04-23 | Finish solidifying pits with two more loads of material from Chemtech. Dailey Excavating will start covering the pits today. | ||||
-231882164 | 2009-04-08 | Whipstock Natural Gas is starting to move equipment on the location. Pits will not be dug and the well will not be spudded until 4/13. | ||||
-697510581 | 2009-04-22 | Chemtech is on site to start solidifying the drilling pits. Work will continue through the day and continue tomorrow if necessary. | ||||
1240863609 | 2009-04-21 | Pits are fenced, lined and in good condition. Scheduled to start solidification on 4/22. | ||||
1244147655 | 2009-06-02 | The tank battery has been built and is fenced. The salesline has been installed. The well should be ready for turn on later this week. | ||||
2100944865 | 2010-04-20 | Preliminary restoration is approved. | ||||
696263853 | 2009-06-16 | The affected area has been graded and will be seeded and mulched in the near future. The well is in production and the required fencing and identification are in place. | ||||
983681203 | 2009-04-17 | Whipstock is drilling ahead in the Clinton. They should TD the well later today and are planning to move to the next location (Kormish 4) on Saturday. |