If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-20746 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.0150898847,"lon":-80.9458248487,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.0150898847 | |
Longitude: -80.9458248487 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1155724587 | 2014-07-28 | On the date of inspection I accompanied ODNR Inspector Andrew Corder to check the drilling status of the well. Refer to Andrew Corder's report for further details. | ||||
-1623693553 | 2014-07-30 | On the day of my inspection the company had almost reached total depth. The 5.5" casing would be ran and cemented after reaching T.D and cleaning the hole. No violations noted. | ||||
-296446333 | 2014-08-04 | Halliburton cemented the 5.5" casing on 8/3/2014. Patterson 349 is moving to the 3H well this date. | ||||
1323896946 | 2014-06-02 | Onsite with Inspector Andrew Corder. See his inspection report this date. | ||||
1408366276 | 2014-08-13 | On the day of my inspection Patterson 349 was drilling in the lateral section and would be running casing soon. No violations noted. | ||||
1595302668 | 2014-06-02 | On the day of my inspection Patterson # 349 was rigging up to begin drilling. No violations noted. | ||||
1852527936 | 2014-07-28 | On the day of my inspection Patterson 349 was drilling ahead in the lateral section. No violations noted. | ||||
1967183186 | 2014-07-09 | On the day of my inspection the 13.375" casing was ran and cemented. See cement ticket for details. No violations noted. |