If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-20691 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.0327231405,"lon":-81.1456404368,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-05-09 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.0327231405 | |
Longitude: -81.1456404368 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-2011717746 | 2014-04-08 | On the day of my inspection Stingray was performing a squeeze cement job on the 5.5" casing string. I review the cement bond log to ensure that the job was successful. No violations noted. | ||||
-2128908253 | 2013-09-25 | On site to witness surface job, rig crew attempted to run 355' of 18.625 but pipe sat down @ 152' and they were unable to get past that point so decision was made to pull casing from well and ream out well bore and try again tomorrow. | ||||
1380241753 | 2013-09-26 | On site to witness rig crew attempt to run 16" casing into well casing sat down@ 152' just as the 18" casing did so decision was made to pull casing again and ream out well bore. | ||||
1380550123 | 2013-09-30 | On the day of my inspection Paterson 480 was attempting to run their 18.625 casing string. Casing would not progress past casing point. No violations noted. | ||||
1388372070 | 2013-12-02 | On the day of my inspection Patterson 480 was preparing to begin running 5.5" casing. No violations noted. | ||||
48073369 | 2013-11-25 | On the day of my inspection Patterson 480 had almost reached total depth. No violations noted. |