34-153-22951

Well Details

Well ID: 34-153-22951
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2006-01-19
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 41.3095934537
Longitude: -81.4264055846

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-2036523907 2006-01-25 Drilling pits are fenced, lined and have sufficient freeboard.
-2045278896 2006-09-19 Preliminary restoration is approved.
-505826492 2006-01-19 Capstar Drilling Rig #3 is moving on site and should spud the well later today. The drilling pits were dug on the west side of the location as opposed to the south side which were agreed upon during the pre-permit inspection. If any pit integrity concerns arise during the drilling of this well, the pits will be pumped out, solidified, buried with any new pits will be dug south of the well.
1140016841 2006-02-13 The drilling pits are being solidified today. They should be closed completely later this week.
1214384937 2006-01-11 The lease road and location are being built in anticipation of the drilling rig arriving within a week. Signage is posted. No violations at this time.
1237387311 2006-01-30 Drilling pits are lined and fenced off. No violations at this time.
51725280 2006-01-23 Capstar is drilling ahead. TD should be reached on Tuesday. The pits are lined. No violations at this time.
640239081 2006-04-25 The site has been rough graded, the tank battery has been set and the chain link fence has been installed. Before the well can be placed in production, the charcoal canister, lightning arrestor and low pressure relief valve must be installed. No violations at this time.