X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-005-22972

Well Details

Well ID: 34-005-22972
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1973-07-11
Unconventional:
Horizontal:
Producing: No
Violations: 1
Latitude: 41.0384264255
Longitude: -82.1768923782

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1776958478 2014-06-19 The well is not capable of production. Lines to the motor valves for the autoswab are rusted off. There is no power at the control box for the autoswab. The tank at the separator is rusted out. No ID is posted at the location. The operator has previously indicated that they would service or plug this well and others in the area by Spring 2014. No work has been performed to plug or produce the well. The well needs to be plugged. Complete well plugging and restoration of the location by 12/20/14. NONE
1400251776 2014-05-16 The well is equipped with an autoswab. The motor valve lines are deteriorated and there is no power to the control box. The well is not in production. There is a 25 Bbl tank and separator in the battery. The tank is rusted out.
1405516576 2014-07-15 The operator has not posted ID, replaced tanks or made any repairs to the well. They have not taken out a plug permit yet. The well needs to be plugged by 12/20/14. The operator stated in a phone conversation on 7/16/14 that he was waiting on pipeline and wants to put the well in production. I told him that he can work on the well and post ID whether or not pipeline is in place. He stated all he can do is meet with landowners. He was reminded that plugging is due by December if the well remains non compliant.