34-053-20413

Well Details

Well ID: 34-053-20413
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1979-01-31
Unconventional:
Horizontal:
Producing: No
Violations: 1
Latitude: 38.9932399691
Longitude: -82.1601774763

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1038230659 2003-03-11 No violations at the time of inspection.
1104022472 2014-02-24 The operator has installed the identification sign on this wellhead with all the correct information. There is no further action required at this time.
1367254794 2013-04-25 This is a Pumping unit wellhead. There was no identification on the standard R.G. Brasel sign template. According to 1501:9-9-05(A)10/1509:23 the well identification sign shall include owner's name, county, township, well name and number, permit number for the well, and emergency contact number. There is a 9-3/4 inch cap on the unmeasured surface casing. Out of the top of this cap is a 3-1/2 inch casing rising in a T-fitting. Two 2-5/16 inch pipes are coming out the sides of this fitting. There is a cap on top of this fitting and a 1-7/8 inch tubing is coming out the cap ending in another t-fitting . Coming out the sides of this fitting is a 1-5/16 inch and 2-3/8 inch pipes. On top of this fitting is the stuffing box assembly. Tank battery consists of two 100-barrel steel tanks, tow tall liquid/gas separators, only one is connected to gas line, and a 1100-gallon poly tank within the containment area. The dike walls of the containment need to beefed up with respect to height. 9-9-05(A)10