{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.6193136839,"lon":-82.9478203453,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2006-12-20 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 39.6193136839 | |
Longitude: -82.9478203453 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1518756966 | 2008-09-10 | - Pump unit operating while on site. ID on tanks. Operator has constructed a fence around tanks and well. Area round tanks and pump unit clean. | ||||
1167154073 | 2006-12-23 | - Contact 3:00 PM on 12/23/2006 for surface casing on well. Left at 6:00 PM and arrive on site, operator had started to run 7 inch casing in the ground. Three (3) joints went together but when operator started to connect new casing to existing casing the threads stripped. Drilled tried 3 other joints before calling off cement job. Operator shut down till Tuesday 12/26/2006. | ||||
1167322070 | 2006-12-26 | - Contacted that surface cement job would be at 6:00 PM.
- left at 5:00 PM to travel to Pickaway County, arrive at drill site, no casing on location, wait for casing to arrive. 7 inch casing arrive operator start running casing at 6:30 PM. All joint screwed together with no problem. 832 feet of casing plus 7 foot landing joint. - Cement job started at 8:30 PM, 140 sacks of cement for job, good circulation while pumping. BOP test on 12/28/2007 at 5:30 AM, not on site to witness BOP test. |
||||
1171381086 | 2007-02-05 | - Well is in production. Operator has graded area around well and build dike around tanks. Operator has place chain link fence around pump unit and tanks, also construct a gate across lease road.
- Pump unit operating while on site. ID on Tanks. - Weather Sunny Temp 10 |
||||
1268834110 | 2010-03-17 | - Berry Well Service on site, had pulled rods and pump from well, replace pump and place rods back into well. Pump unit was operating while on site. Service crew moving to Warner #1 to service well.
- ID on tanks, fence around tank battery and well. Area clean no debris on site. |
||||
1300711813 | 2011-03-17 | - ID on tank, tank dike area clean and free of water. Pump jack operating while on site.
- Tank area and pump jack are fence in. Lease road well maintained and stoned with crushed aggregate. - Weather Sunny Temp 60's wet ground conditions. |
||||
1359047526 | 2013-01-24 | - ID on tanks, Tanks dike area clean and free of water. Tank battery fence in.
- Pump unit not operating while on site, pump unit fence in. - lease road well maintained with crushed aggregate. |
||||
1399113275 | 2006-12-20 | - Contacted by operator that rig moved on site today. Stop at location rig set up digging pits, operator plans to start drill 12/21/2006 and set conductor, and may be ready for surface casing on 12/22 or 12/23.
- Bowman Drilling contactor doing drilling. |
||||
1842022250 | 2007-01-09 | - Progress of well completion, pump unit in place. Tank in place, pits filled and area graded. Three 210 barrel tank in place. GPS taken at well and tank area. | ||||
2122563879 | 2007-01-04 | - On site for progress of completion of well. Pits drained, filled and graded. Area around well graded.
- Tanks on location. |