If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22150 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.4853066206,"lon":-80.9633033237,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-07-12 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.4853066206 | |
Longitude: -80.9633033237 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1690206565 | 2012-07-13 | I was on site to witness the cementing of the 13 3/8" casing. My inspection revealed that Nomac Rig #41 has drilled a 17.5" hole to a total depth of 573' and ran 573' of 13 3/8" casing with 6 centralizers installed on the casing string. Halliburton cemented the 13 3/8" casing with 540 sacks of Class "A" cement (1% CaCl and .25 #/sack Floseal). There was good circulation throughout the entire job and there was 24 barrels of cement circulated to surface. | ||||
1342396646 | 2012-07-15 | I was on site to witness the cementing of the 9 5/8" intermediate casing. Nomac Rig #41 reached a total depth of 2012' and ran 47 joints of 40#, 9 5/8" casing to a depth of 2012'. They installed 17 centralizers on this casing string. Halliburton cemented the 9 5/8" casing with 750 sacks of Class "A" cement with 1/4 #/sack Floseal and 12% salt. Good circulation throughout the job and 22 barrels of cement circulated to surface. | ||||
1343056281 | 2012-07-23 | I was on site to check the status of Nomac Rig # 41 and check the status of Express Energy Services conductor rig drilling the other Elwood wells conductor holes. My inspection revealed that Nomac #41 is drilling the curve at 8203'. Express Energy Services is drilling the conductor holes and mouse holes for the # 8 and # 10 wells. Shawn with Express Energy Services advised that it would be later today or this evening before they were ready to cement the conductor on these two wells. |