X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-22150

Well Details

Well ID: 34-019-22150
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2012-07-12
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 40.4853066206
Longitude: -80.9633033237

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1690206565 2012-07-13 I was on site to witness the cementing of the 13 3/8" casing. My inspection revealed that Nomac Rig #41 has drilled a 17.5" hole to a total depth of 573' and ran 573' of 13 3/8" casing with 6 centralizers installed on the casing string. Halliburton cemented the 13 3/8" casing with 540 sacks of Class "A" cement (1% CaCl and .25 #/sack Floseal). There was good circulation throughout the entire job and there was 24 barrels of cement circulated to surface.
1342396646 2012-07-15 I was on site to witness the cementing of the 9 5/8" intermediate casing. Nomac Rig #41 reached a total depth of 2012' and ran 47 joints of 40#, 9 5/8" casing to a depth of 2012'. They installed 17 centralizers on this casing string. Halliburton cemented the 9 5/8" casing with 750 sacks of Class "A" cement with 1/4 #/sack Floseal and 12% salt. Good circulation throughout the job and 22 barrels of cement circulated to surface.
1343056281 2012-07-23 I was on site to check the status of Nomac Rig # 41 and check the status of Express Energy Services conductor rig drilling the other Elwood wells conductor holes. My inspection revealed that Nomac #41 is drilling the curve at 8203'. Express Energy Services is drilling the conductor holes and mouse holes for the # 8 and # 10 wells. Shawn with Express Energy Services advised that it would be later today or this evening before they were ready to cement the conductor on these two wells.